HomeMy WebLinkAboutReview Checklist -.4'
I(/'2 J TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. /' I Lot6 Zone of Contribution: In Out Acres
• ff -, reir
Commercial: Residential:
Street: is )r C� -/) (#111,4.„-
Village: )r\,. ,,Y, _ Floor Plan: ( ' . oms:
/__ _-----:.N.)
`�f /� / Installer: ]Owner: ®� 4. 7?-� 7cz)Sfi 4 (•4rlig----`4 ,--- .�
Address: Phone: c "�1J /
Phone: d1A7L - / /f
Builder: ZVEngineer: Afdt<al .-.( %
Address: Phone: - f`.0 r /`C 7 7
Phone: '" :- t' '??
.4A1,,,e{ , 4 7,,,,,,-'ce- -
N/A YES NO
1.Required# of copies received
2.Date of soils exam and percolation test not older than 2 years k..----^
3.4-5 ft of naturally occurring pervious material, above water table ( ----
4.
-.4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: `-
5.Water line 10 ft from septic components Var.: C
6.Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.:
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: L%/
9.Leaching minimum 100 ft from wetlands Var.: % .--
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: C ------ .
11.Tank/leaching minimum 10 ft from property line Var.: (..------
12.System meets all other setback requirements Var.: -----
13.Uses adjustment for maximum high groundwater __Var.: -
14.Leaching set 4-5 ft above adj.water or bottom test hole Var.:
15. System not in top or subsoil(A,B horizons) o 5' remov
16.Proposed contours are suitable (....-----
17. System meets slope requirements-min. 1/8", 1/4"preferred ‘,.._..---
18.
�._18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee �'--
20. Sewage is under 10,000 gpd for parcel
• 21.No garbage disposal *LL._
22. System adequately sized for its intended use .....
23.Minimum 6"stone or compacted below tank and dbox ---""-
24.Manhole covers within 6"of grade,pump chamber cover to grade ...------
25.Inspection port on plastic chambers/leach field
26.Electrical permit for pump chamber/Separate meter for duplexes
27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size
28. Septic tank/pump chamber to be factory waterproofed
29.Vent provided if leaching below 3 feet,under driveway/parking ./'
30.Buoyancy calculations for tank/pump chamber
31.Engineer to inspect and certify soils: wall: commercial:
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33.H-20 loading is subject to vehicular traffic, groundwater .....---
34. Title V Application and permit fee, installer signature mss,----
35.Foundation footing min. 2 feet above adjusted ground water for new house /"
_ 36.Deed Restriction required max. #bedrooms: max. flow: gpd
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: ,% ) 6/03/03