HomeMy WebLinkAboutReview Checklist r
-2' / rC TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. 1 Lot *2#7 Zone of Contribution: In_ Out_Acreage
Commercial: Residential:
Street: f)-- T(rze 0(Qn /ay
Village: (,%/ ttet Floor Plan: #Bedrooms: 2
Owner: Installer: 6
c-- -A.
Address: 17 Phone: r% - 4---17 -OG S-73
Phone:
Builder: Engineer: 2Us/ o
Address: Phone: +1- 7? /
Phone: f 6x -e' %_
N/A YES NO
1.Required#of copies received ``"`---"
2.Date of soils exam and percolation test not older than 2 years (.---------
3.4-5 ft of naturally occurring pervious material, above water table ,--_----
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5.Water line 10 ft from septic components Var.: .. ------
6.Benchmark indicated and shown-NGVD if near wetlands `.-----"
7. Septic tank minimum 10 ft from foundation, deck Var.: Z.--------
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 1.---------
9.Leaching minimum 100 ft from wetlands Var.: _________
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11.Tank/leaching minimum 10 ft from property line Var.: �--'�
12. System meets all other setback requirements Var.:
13.Uses adjustment for maximum high groundwater Var.: 1/4....-----
14.Leaching set 4-5 ft above adj. water or bottom of test hole Var.:
15. System not in top or subsoil(A,B horizons)or 5'removal ,............--
16.
�16.Proposed contours are suitable `--- -"
17. System meets slope requirements-min. 1/8", ' "preferred `--
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee -_---
20. Sewage is under 10,000 gpd for parcel --
21.No garbage disposal ....:.---
Q2.
=22. System adequately sized for its intended use
___.-----
23.Minimum 6"stone or compacted below tank and dbox ,...-------
_74.Manhole covers within 6"of grade,pump chamber cover to grade ___--A
25.Inspection port on plastic chambers/leach field
26.Electrical permit for pump chamber/Separate meter for duplexes .--- --'
27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size .------
28.Septic tank/pump chamber to be factory waterproofed --------
29.Vent provided if leaching below 3 feet,under driveway/parking -
;
30.Buoyancy calculations for tank/pump chamber
31.Engineer to inspect and certify soils: wall: commercial: ✓ ���
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33.H-20 loading is subject to vehicular traffic, groundwater . .- ---
34.Title V Application and permit fee, installer signature
35.Foundation footing min. 2 feet above adjusted ground water for new house ,-----
36.Deed Restriction required max. #bedrooms: max. flow: gpd _ -
37.Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: ' 6/03/03