1) The insitillallon shall COMI) t.
10111 Title V 1111d Town of loard o
SOIL EVALUATOR A; L6ATOR ! — \j? r I . � I leallh Regulations.
`
WITNESS 2) The installer'shall verify the location of utilities, sewer inverts and septic
,.i
DATE; components prior to installation and selling base elevations.
PERCOLAT OIATE:
'N 3) All pravily septic -piping to be 4 inch Sch 40 PVC at 118" per root. The first
:I
(Wo feet out of (lie d -box to the lenching shall be level.
4) This plan Is not to be utilized for property line delerminalion nor nny o(her
T11-2
purpose other than the proposed system installation.
Lt 5) All septic components must meet Title V specifleations.
10 6) Parking shall, not be constructed over 1-110 septic components.
-7) The property is bounded by property corners and property lines.,
8) The property owner shall review dessign considerations to approve of total
design. flow and nurnbO of bedrooms to beconsidered for design'. Receipt
ZA%1 of payment f6r the plan and installation based on the plait shall be deemed
approval of the design flow by the owner.
9) The -existing leaching or cesspools shall be pumped and filled with material
her Title V abandonment procedures. Those w ilhin the proposed SAS shall
be removed along willi contaminated soil and replaced with clean sand per
Title V specs.
10) System components to be 10 116et from water line. Sewer lines crossing the
1W4 P. aler lineshall be sleeved with 4 Inch SCI (40 PVC whit ends grouted if
applicable. The proposed SAS is being Installed below the wateriseevice
line. The line is to be sleeved as aforementioned and maintained in place.
'
SEPT IC SYSTEM. I GN 11) If a garbage grinder exists it is to be removed and is the responsibility of the
owner to ensure such.
FLOW EST IMATE 12)The installer Is to take caution in excavation around the gas line if such
BED'HOOMS: AT 110 GAL/DAY/BEDROOM GAL/DAY i 13) The installer sliall verify.(he location, quantity and elevation of the sewer
lines exiting the dwelling*prior to the installation.
14)This plan is reprcsbnialivc only that a system can fit on a property meeting
SEPTIC TANK.- 'Fille V requirements.
GAL/DAT x 2 DAYS.4 -OAL
USE, 1CC0e11LON'-SEPj'IC TANK
SOICABSORPTION SYSTEM
LL11 7,
L>1
WT6rol__IE�
_,7 1 0
SIDE k3EA: Z_X, e'05 J DAVID <1
MASON R'
BOTTOM AREAS. 7NO 1066
SA79
S E I C SYSTEM SECT I ON
JUIN Z 812010
r HEALTH DEPT
AN FLA
D.. I
V
LJ 4, V1
V. fit) 0
cX?_,71) bi pig=_
GAL
SEPTIC T
-74-
U gL
Ix
K
V 'Irmo
ut43 Health Department
pl? r"__ VVED
7
acme Date
DATE IIEALTII AGEUT EA51- 5ANOW1W, MA
(508) 033-2177
4
�
`
4