Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH • SEWAGE PLAN REVIEW CHECKLIST Location: AM /'7 LOT C/a/7 Date of Subdivision Approval S -3 ''%%S Street // f 3 /e ' Zone of Contribution: In Out 7 Village 0. tfrw r Conunercial Residential , Owner: /PE A"- \7;57seievo Installer riQK7 k-,s i -vG-- 9/n - 7&> - 9:J.-Dr 770- 69'414+ Builder: J.,/71 / iiiiey Engineer , '/?2%i f-A-1_/- iQi -77S 9:5. 9 -77/0 N/A YES NO 1. Required number of copies received. 2. Date of soils exam and percolation test not older than 2 years. 3. 4 feet of naturally occurring pervious material, above water table(new construction) 4. Foundation 2 feet above high point of fronting road for new construction. 5. Water availability letter from Water Department for new construction. 6. Benchmark indicated and shown- NGVD if near wetlands. 7. Building sewer does not exit center of house. 8. Septic tank a minimum of 10 feet from house and deck. 9. Leaching a minimum of 20 feet from house and 10 feet from deck. X 10. Leaching a minimum of 100 feet from wetlands. 7C 11. Leaching a minimum of 150 feet from drinking wells/25 feet from irrigation wells. X 12. System meets all other setback requirements. S 13. Uses adjustment for maximum high groundwater. X 14. Leaching 4 -5 feet above adjusted water table or bottom of test pit. X 15. System not in top or subsoil or 5 foot removal. 7C 16. Proposed contours are suitable. 17. System meets slope requirements - min. 1/8", 1/4" preferred. X 1.8. System meets breakout requirements- peastone elevation carried out 15 feet minimum. )C 19. Specified tee sizes are proper. gas baffle on outlet tee. 20. Sewage flow under 10.000 gpd for parcel. X 21. No garbage disposal. 22. System adequately sized for its intended use. X 23. Minimum 6" stone or mechanically compacted below the tank and d-box. 24. Manhole covers within 6" of grade - septic tank and pump chamber. YC 25. Electrical permit for pump chamber. X 26. Pump system - 2" line, weep hole, check valve, sanitary in d-box, alarm on separate circuit)( 27. Septic tank and pump chamber to be Factory waterproofed. X 28. Vent provided if leaching below 3 feet or under driveway or parking. 29. Engineer to inspect and certify : a. clay removals b. wall construction schedule )c. c. commercial system X 30. Engineer and Land Surveyor stamp and signature. .X 31. H2O loading when system subject to vehicular traffic. X 32. Title V application and fee signed by a licensed installer. `X 33. Foundation footing 2 feet above adjusted water table. x 34. Lot subdivided prior to July 31, 1986 - Nitrate Loading. 35. Subdivided prior to April 7, 1989 - Phosphorius Zone 300'. Plan reviewed by: 66C....