Loading...
HomeMy WebLinkAboutEngineered Plan - Rev. 1998TEST HOLE LOGS ENGIN.J'ER: THOMAS McLELLAN, P.E. WITNESS: AMY VON HONE, R.S. DATE: 7-12-95 PERCO.',ATION RATE: < 2 MIN/IN TH-1 TH-2. 19.0 00, -� --jam_- - •`• TH-1 WORK LIMIT LINE �. SIN .•�: .t. - -• ` � �' � . � � � . .�� � (DOUBLE STAKED MAY BALES) c9N EXISTING DIRT DRIVE _ - s 1 _ -- b L / toy ' ,,,f'' .' .. . / / .' COASTAL BANK BORDERING ` VEGETATED WETLAND EDGE OF MARSH -- - - -- - - - - -- EXISTING PIER KEY: EXISTING CONTOUR: PROPOSED CONTOUR: EXISTING SPOT ELEVATION: 25.5 PROPOSED SPOT ELEVATION: 25 t -TEST HOLE: UTILITY POLE: -0- FENCE LINE: HYDRANT: RETAINING WALL: TREE: DM # 94-117-(D10F20) A HORIZON 2 9- LOAMY SAND B HORIZON LOAMY SAND 24" 2.5Y 618 Cl HORIZON MEDIUM SAND WITH GRAVEL 2.5Y 7/6 NOTE'S: 1. VERTICAL DATUM .NGVR 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM.. ' 4. ALL PRECAST UNITS TO CONFORM WITH AASHTO H-10 LOADING SPECIFICATIONS. 5. PIPE PITCH= 1/4" PER FOOT, (UNLESS NOTED OTHERWISE). 17.0 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE. SET LEVEL. ELEV 7. THE SEPTIC SYSTEM! HAS NOT BEEN DESIGNED TO ACCOMODATE THE 162 USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE. STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL 15.0 HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3.0'. 11. D -BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOW. 80 < 132" 1 6.0 ..12 DESIGN HNGIN 11 !'!1 I�iNSPECT AND CERTIFY SEPTIC SYSTEM CONSTRUCTION. NO GROUNDWATER ENCOUNTERED SEPTIC SYSTEM DESIGN FLO?f ESTIMATE: .4 .BEDROOMS AT 110 GAL/DAY/BEDROOM = OL GAL/DAY SEPs'IC TANK 4' 24' 6111 • z4rq� Al CAL/DAY x 2 DAYS = 880 GAL 4 cs � U�:E 1500 GALLON SEPTIC TANK PROPOSED SO', 4 BEDROOM v � 30' DWELLING LEACHING AREA: 6' 24' USE 2 LEACH TRENCHES (42'x 3'x 2' DEEP) 4' z4' 8' 24 DECK 12� WALK -OUT PROPOSED DWELLING S.lDE AREA 42 + 3 2 x 2 = 180 SF (.74) = 133 GAL/DAY B)ITTO�V AREA. 42 x ? = 1?6 SF (74) =_13 CAL/DAY ... tr.-.-r Ctinr,lit. )-.26 a � iia -- ^' `j r, z 2 TRENCHES = 452 GALIDAY SEPTIC SYSTEM SECTION 2" PEASTONE COVERS WITHIN 12' OF 3/¢" 1 1/2" 20.5 FINISHED GRADE WASHED STONE (ONE INSPECTION COVER TOP OF FOUNDATION TO BE WITHIN 6" of GRADE) I� 4" PERFORATED PVC PIPE ELEV: 16.15 .L� ELEV. DM DEMAREST-McLELLAN ENGINEERING 24 SCHOOL STREET P.O. BOX 463. FEST DENNIS, MASSACHUSETTS 024170 G•' 17.05 ELEV. D -BOX 13.65 .1500 GAL 15.98 ELEV. ELEV. SEPTIC TANK 16.15 (6" OF ELEV. 42' - (6" OF STONE UNDER) ELEV. STONE TWO LEACH TRENCHES UNDER) 5 86 (42' x 3' x 2' DEEP) TEE SIZES: INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN AP ROVED BY: DATE: yt %%AOF��S ' �h`1r �t �.5 , 1.. Y' �• _� CIVIL y '�1.•� r•�:;.3E?ti51;: � � R 4 THOMAS MCLELLAN, P.E. JOHN Z. DEMAREST JR., PLS. ELEV. (MIN DISTANCE BETWEEN TRENCHES = 9') SITE AND SEWAGE PLAN LOCATION.• LOT 1 PRINCE ROAD WEST YARMOUTH, MA PREPARED FOR: ABRAHAM JOSELOW SCALE: 1" = 40' DATE: 7-12-95 REFERENCE: PLAN BOOK 512, PAGE 76 - REVISED: 1-29-98 EL A HORIZON LOAMY SAND 18 B HORIZON LOAMY SAND 2.5Y 6/8 24" 17.0 Cl HORIZON MEDIUM S.,' . D WITH G V:,L i 4" 2.5Y 5 6 14,5' C2 HORIZON MEDIUM -FIXE SAND 2.5Y 7/4 s2" 00, -� --jam_- - •`• TH-1 WORK LIMIT LINE �. SIN .•�: .t. - -• ` � �' � . � � � . .�� � (DOUBLE STAKED MAY BALES) c9N EXISTING DIRT DRIVE _ - s 1 _ -- b L / toy ' ,,,f'' .' .. . / / .' COASTAL BANK BORDERING ` VEGETATED WETLAND EDGE OF MARSH -- - - -- - - - - -- EXISTING PIER KEY: EXISTING CONTOUR: PROPOSED CONTOUR: EXISTING SPOT ELEVATION: 25.5 PROPOSED SPOT ELEVATION: 25 t -TEST HOLE: UTILITY POLE: -0- FENCE LINE: HYDRANT: RETAINING WALL: TREE: DM # 94-117-(D10F20) A HORIZON 2 9- LOAMY SAND B HORIZON LOAMY SAND 24" 2.5Y 618 Cl HORIZON MEDIUM SAND WITH GRAVEL 2.5Y 7/6 NOTE'S: 1. VERTICAL DATUM .NGVR 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM.. ' 4. ALL PRECAST UNITS TO CONFORM WITH AASHTO H-10 LOADING SPECIFICATIONS. 5. PIPE PITCH= 1/4" PER FOOT, (UNLESS NOTED OTHERWISE). 17.0 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE. SET LEVEL. ELEV 7. THE SEPTIC SYSTEM! HAS NOT BEEN DESIGNED TO ACCOMODATE THE 162 USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE. STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL 15.0 HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3.0'. 11. D -BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOW. 80 < 132" 1 6.0 ..12 DESIGN HNGIN 11 !'!1 I�iNSPECT AND CERTIFY SEPTIC SYSTEM CONSTRUCTION. NO GROUNDWATER ENCOUNTERED SEPTIC SYSTEM DESIGN FLO?f ESTIMATE: .4 .BEDROOMS AT 110 GAL/DAY/BEDROOM = OL GAL/DAY SEPs'IC TANK 4' 24' 6111 • z4rq� Al CAL/DAY x 2 DAYS = 880 GAL 4 cs � U�:E 1500 GALLON SEPTIC TANK PROPOSED SO', 4 BEDROOM v � 30' DWELLING LEACHING AREA: 6' 24' USE 2 LEACH TRENCHES (42'x 3'x 2' DEEP) 4' z4' 8' 24 DECK 12� WALK -OUT PROPOSED DWELLING S.lDE AREA 42 + 3 2 x 2 = 180 SF (.74) = 133 GAL/DAY B)ITTO�V AREA. 42 x ? = 1?6 SF (74) =_13 CAL/DAY ... tr.-.-r Ctinr,lit. )-.26 a � iia -- ^' `j r, z 2 TRENCHES = 452 GALIDAY SEPTIC SYSTEM SECTION 2" PEASTONE COVERS WITHIN 12' OF 3/¢" 1 1/2" 20.5 FINISHED GRADE WASHED STONE (ONE INSPECTION COVER TOP OF FOUNDATION TO BE WITHIN 6" of GRADE) I� 4" PERFORATED PVC PIPE ELEV: 16.15 .L� ELEV. DM DEMAREST-McLELLAN ENGINEERING 24 SCHOOL STREET P.O. BOX 463. FEST DENNIS, MASSACHUSETTS 024170 G•' 17.05 ELEV. D -BOX 13.65 .1500 GAL 15.98 ELEV. ELEV. SEPTIC TANK 16.15 (6" OF ELEV. 42' - (6" OF STONE UNDER) ELEV. STONE TWO LEACH TRENCHES UNDER) 5 86 (42' x 3' x 2' DEEP) TEE SIZES: INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN AP ROVED BY: DATE: yt %%AOF��S ' �h`1r �t �.5 , 1.. Y' �• _� CIVIL y '�1.•� r•�:;.3E?ti51;: � � R 4 THOMAS MCLELLAN, P.E. JOHN Z. DEMAREST JR., PLS. ELEV. (MIN DISTANCE BETWEEN TRENCHES = 9') SITE AND SEWAGE PLAN LOCATION.• LOT 1 PRINCE ROAD WEST YARMOUTH, MA PREPARED FOR: ABRAHAM JOSELOW SCALE: 1" = 40' DATE: 7-12-95 REFERENCE: PLAN BOOK 512, PAGE 76 - REVISED: 1-29-98