Loading...
HomeMy WebLinkAboutReview Checklist 3-1f7Y 2 ,e-e'- ---; /. TOWN OF YARMOUTH � �� �=�` - SEWAGE PLAN REVIEW CHECKLIST AC- Location: A.M. Lodi 9e.....-- of Contribution: In Out_ Acreage 1/ (FO‘' c���j Commercial: Residential:✓y Street: G / I n Village: V - Floor Plan: V #Bedrooms: Owner: 4(4£ el Installer: 412 S2°%� Address: Phone: QS --1‘.-/-5 oP L_ Phone: , Builder: Engineer: re/VI Address: Phone: -_7 7.sem-'97 01 Phone: �2�jyjr. ,'� Sur /,eJ_. N/A YES NO 1.Required#of copies received l/' 2. Date of soils exam and percolation test not older than 2 years _ (....--'- 3. 4-5 /3. 4-5 ft of naturally occurring pervious material, above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 1. . 5.Water line 10 ft from septic components Var.: _t_....------ 6. Benchmark indicated and shown-NGVD if near wetlands (....----- 7. Septic tank minimum 10 ft from foundation, deck Var.: r>, L___ 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9.Leaching minimum 100 ft from wetlands Var.: L.----- 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: (...---- 12. System meets all other setback requirements Var.: L.----- 13. Uses adjustment for maximum high groundwater Var.: L,o' 14. Leaching set 4-5 ft above adj.water or bottom of test hole Var.: t.- 15. System not in top or subsoil(A,B horizons) or 5' removal L.------ 16. '16.Proposed contours are suitable L---- 17. System meets slope requirements-min. 1/8", 1/4"preferred t.....---- 18. System meets breakout requirements PVC liner: Wall: L/ 19. Specified tee sizes are proper, gas baffle on outlet tee L.----- 20. /20. Sewage is under 10,000 gpd for parcel (------- 21. /21.No garbage disposal _ (f 22. System adequately sized for its intended use 1/ ;23.Minimum 6"stone or compacted below tank and dbox L� 24.Manhole covers within 6"of grade,pump chamber cover to grade L.------ 25. /25. Inspection port on plastic chambers/leach field k....---- 26. L26. Electrical permit for pump chamber/Separate meter for duplexes L / 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size `/ 28. Septic tank/pump chamber to be factory waterproofed L� 29.Vent provided if leaching below 3 feet,under driveway/parking .....------ 30. Buoyancy calculations for tank/pump chamber L .----" 31.Engineer to inspect and certify soils: wall: commercial: t/ `� 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic, groundwater 34.Title V Application and permit fee, installer signature - ‹../' 35.Foundation footing min. 2 feet above adjusted ground water for new house L� 36.Deed Restriction required max. #bedrooms: max. flow: gpd - 37.Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: ) 6/03/03