Loading...
HomeMy WebLinkAboutReview Checklist -2-z 7e TOWN OF YARMOUTH `1 SEWAGE PLAN REVIEW CHECKLIST 476 y j , ', '/C' i,, Location: A.M. 7c Lot /0 ' Zone of Contribution: Inut Acreage 2.1 6.17Z) ���i �����Ol� Commercial: Residential: �I Street: ����,, 4/4' Village: !�(/.- Q` Floor Plan: IZ #Bedrooms: Owner: g ef),Id'ea//�' d Installer: fi a A G Address: Phone: C`Pif -1-3 2 .0'5.-3D Phone: /� Builder: Engineer: S 566r-t,/v-- TditfiG, Address: Phone: _IV/ �Zr Phone: ) ty z' / C''e-e C7 N/A YES NO 1.Required#of copies received L// 2.Date of soils exam and percolation test not older than 2 years (----- 3.4-5 --3.4-5 ft of naturally occurring pervious material, above water table ......---- 4.Foundation 2 ft above high_point of road H.P.: Fnd: Var.: ; ---" 5.Water line 10 ft from septic components Var.: L_ ----- 6.Benchmark indicated and shown-NGVD if near wetlands 7.Septic tank minimum 10 ft from foundation, deck Var.: .....---- 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: (:.------ 9. ✓"9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: _ ----'` 12. System meets all other setback requirements Var.: c----- 13. r13.Uses adjustment for maximum high groundwater Var.: 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: �./ 15.System not in top or subsoil(A,B horizons)or 5' removal 16.Proposed contours are suitable 4.....-.,- 17. System meets slope requirements-min. 1/8", ' "preferred �..- 18. System meets breakout requirements PVC liner: Wall: L------- 19. Specified tee sizes are proper, gas baffle on outlet tee C_----- 20. am`20. Sewage is under 10,000 gpd for parcel L---- 21.No garbage disposal 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox .�-- 24.Manhole covers within 6"of grade,pump chamber cover to grade (------ 25.Inspection port on plastic chambers/leach field �- 26.Electrical permit for pump chamber/Separate meter for duplexes �j, 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed -- -- 29.Vent provided if leaching below 3 feet,under driveway/parking 30.Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: ---- 32. 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature .------ 33.H-20 loading is subject to vehicular traffic, groundwater ----- 34. Title V Application and permit fee, installer signature ‘....------ 35.Foundation footing min. 2 feet above adjusted ground water for new house �-' 36.Deed Restriction required max. #bedrooms: max. flow: gpd -----' 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: J 6/03/03