Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH • L�-Q, SEWAGE PLAN REVIEW CHECKLIST . Location: A.M. l / Lot r 1 Zone of Contribution: In_ Out �/� � G,, 7 Commercial: Residential: Street: IA LAW `�l• j`04 e Village: v Floor Plan: ✓ #Bedrooms: A.94 ,� Owner: Installer: Address: Phone: jc�1s ' 7-- 06 Phone: Builder: Engineer: � /474101,-"--- Address: Phone: -5-6 Q Phone: N/A YES NO 1.Required#of copies received 2.Date of soils exam and percolation test not older than 2 years 3.4-5 ft of naturally occurring pervious material, above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: �--- 5.Water line 10 ft from septic components Var.: 6.Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: �---- _ 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: C� 9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: 13.Uses adjustment for maximum high groundwater Var.: 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons)or 5' removal 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", '/4"preferred �. 18. System meets breakout requirements PVC liner: Wall: e 19. Specified tee sizes are proper, gas baffle on outlet tee L___- - 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal `�- 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox 24.Manhole covers within 6"of grade,pump chamber cover to grade `. 25.Inspection port on plastic chambers/leach field 26.Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed 29.Vent provided if leaching below 3 feet, under driveway/parking 30.Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic, groundwater 34.Title V Application and permit fee, installer signature 35.Foundation footing min.2 feet above adjusted ground water for new house V--� 36.Deed Restriction required max. #bedrooms: max. flow: gpd r 37.Check area lots for groundwater/Label groundwater in Assessor's Ma �L1 �� Plan reviewed by: t 6/03/03