HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
•
L�-Q, SEWAGE PLAN REVIEW CHECKLIST
. Location: A.M. l / Lot r 1 Zone of Contribution: In_ Out
�/� � G,, 7 Commercial: Residential:
Street: IA LAW
`�l• j`04 e
Village: v Floor Plan: ✓ #Bedrooms: A.94 ,�
Owner: Installer:
Address: Phone: jc�1s ' 7-- 06
Phone:
Builder: Engineer: � /474101,-"---
Address: Phone: -5-6 Q
Phone:
N/A YES NO
1.Required#of copies received
2.Date of soils exam and percolation test not older than 2 years
3.4-5 ft of naturally occurring pervious material, above water table
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: �---
5.Water line 10 ft from septic components Var.:
6.Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.: �----
_ 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: C�
9.Leaching minimum 100 ft from wetlands Var.:
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11.Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.:
13.Uses adjustment for maximum high groundwater Var.:
14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.:
15. System not in top or subsoil(A,B horizons)or 5' removal
16.Proposed contours are suitable
17. System meets slope requirements-min. 1/8", '/4"preferred �.
18. System meets breakout requirements PVC liner: Wall: e
19. Specified tee sizes are proper, gas baffle on outlet tee L___-
- 20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal `�-
22. System adequately sized for its intended use
23.Minimum 6"stone or compacted below tank and dbox
24.Manhole covers within 6"of grade,pump chamber cover to grade `.
25.Inspection port on plastic chambers/leach field
26.Electrical permit for pump chamber/Separate meter for duplexes
27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size
28. Septic tank/pump chamber to be factory waterproofed
29.Vent provided if leaching below 3 feet, under driveway/parking
30.Buoyancy calculations for tank/pump chamber
31.Engineer to inspect and certify soils: wall: commercial:
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33.H-20 loading is subject to vehicular traffic, groundwater
34.Title V Application and permit fee, installer signature
35.Foundation footing min.2 feet above adjusted ground water for new house V--�
36.Deed Restriction required max. #bedrooms: max. flow: gpd r
37.Check area lots for groundwater/Label groundwater in Assessor's Ma �L1
��
Plan reviewed by: t 6/03/03