Loading...
HomeMy WebLinkAboutReview ChecklistI -�° '7'7 TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST 1 Location: A.M. /?2_ Lot -714 Zone of Contribution: In Out !/Acreage Commercial: Residential: (r/ Street: 6 ( kPla 5-1(?ceilelf Village: Floor Plan: ./ #Bedrooms: i / Owner: Installer: r -1 f� T! Address: Phone: 9a-g, - 1'k---.)-7/ Phone: Builder: 7 Engineer: dilYt a3zoee?(/‘-6, Address: Phone: . ---b.:-- '77 c- ' rtD Phone: (W795-€7-4A?-17 A YES NO 1.Required#of copies received (_/'' 2.Date of soils exam and percolation test not older than 2 years i------"' 3.4-5 ft of naturally occurring pervious material, above water table 4....-- - 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 4......---- 5. f5.Water line 10 ft from septic components Var.: C� 6.Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: r�-�� 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: t..---- 10. �10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: L._.------ 11.Tank/leaching minimum 10 ft from property line Var.: ..------- 12. .--/12. System meets all other setback requirements Var.: t...------- 13.Uses adjustment for maximum high groundwater Var.: �� • 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons)or 5'removal 07..„../`- 1f /,,077("6rz2I 16.Proposed contours are suitable .L.------ 17. System meets slope requirements-min. 1/8", ' "preferred L-----^ 18. System meets breakout requirements PVC liner: Wall: - J 19. Specified tee sizes are proper, gas baffle on outlet tee 7, ,,,,t-------- 20. Sewage is under 10,000 gpd for parcel t ..--� . 21.No garbage disposal 22. System adequately sized for its intended use ls„--/ 23.Minimum 6"stone or compacted below tank and dbox �/ • 24.Manhole covers within 6"of grade,pump chamber cover to grade L/7 25.Inspection port on plastic chambers/leach field �/ 26.Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed 29.Vent provided if leaching below 3 feet,under driveway/parking l 30.Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic, groundwater cf 34.Title V Application and permit fee, installer signature ✓" 35.Foundation footing min. 2 feet above adjusted ground water for new house �--'1 36.Deed Restriction required max. #bedrooms: max. flow: gpd _��7,....---- 37.Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: CO 6/03/03