Loading...
HomeMy WebLinkAboutReview Checklist 4 /7--/‘ z-> ( --L7 TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST - /1 `�4 / z Location: A.M.f CY Lot O Zone of Contribution: In (Dant Acreage>3 19V / // / Commercial: Residential:„�� Street: 5)7 t' / �� 7 go/ Village: li-A-'= • �2 ,eifr-* Floor Plan: #Bedrooms: Owner: 6---41k .if7 Installer: Address: Phone: c e/ ---f- - fir)-- Phone: /' Builder: Engineer: 4(4 C . '''/"6-5L Address: Phone: / ----a7 7) -�- l,,.d Y,----z,\,-,-Phone: - '\� > 4%, -K_ N/A YES ,,NO 1.Required#of copies received V' 2.Date of soils exam and percolation test not older than 2 years Lam'' 3.4-5 ft of naturally occurring pervious material, above water table z.--- ' 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: �1". 5.Water line 10 ft from septic components Var.: k...------ 6. /6.Benchmark indicated and shown-NGVD if near wetlands L.----- 7. �7. Septic tank minimum 10 ft from foundation, deck Var.: t___.-/ 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: e,/' 9.Leaching minimum 100 ft from wetlands Var.: < -__ 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ,e--- 11.Tank/leaching minimum 10 ft from property line Var.: ,C/ 12. System meets all other setback requirements Var.: C/' . 13.Uses adjustment for maximum high groundwater Var.: ` _ _ 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: L/ 15. System not in top or subsoil(A,B horizons)or 5'removal 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 'A"preferred ......------ 18. --✓18. System meets breakout requirements PVC liner: Wall: cam` 19. Specified tee sizes are proper, gas baffle on outlet tee C ---- 20. 20. Sewage is under 10,000 gpd for parcel c------- 21.No garbage disposal .(.--------- 22.System adequately sized for its intended use k..----- 23. V.-23.Minimum 6"stone or compacted below tank and dbox i,-----' • 24.Manhole covers within 6"of grade,pump chamber cover to grade 25.Inspection port on plastic chambers/leach field `__,/ 26.Electrical permit for pump chamber/Separate meter for duplexes `---- 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size ,.....-- 28.Septic tank/pump chamber to be factory waterproofed ...._----- 29. 129.Vent provided if leaching below 3 feet,under driveway/parking ---- 30.Buoyancy calculations for tank/pump chamber .....31.Engineer to inspect and certify soils: wall: commercial: ,�� \ 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature L.----- 33.H-20 loading is subject to vehicular traffic, groundwater ------- 34.Title V Application and permit fee, installer signature 35.Foundation footing min.2 feet above adjusted ground water for new house ../- 36.Deed Restriction required max. #bedrooms: max. flow: gpd _.--- -- 37.Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: (F---)' 6103/03