HomeMy WebLinkAboutReview Checklist 4 /7--/‘ z-> ( --L7
TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST - /1 `�4 /
z Location: A.M.f CY Lot O Zone of Contribution: In (Dant Acreage>3 19V
/ // / Commercial: Residential:„��
Street: 5)7 t' / �� 7 go/
Village: li-A-'= • �2 ,eifr-* Floor Plan: #Bedrooms:
Owner: 6---41k .if7 Installer:
Address: Phone: c e/ ---f- - fir)--
Phone: /'
Builder: Engineer: 4(4 C . '''/"6-5L
Address: Phone: / ----a7 7) -�- l,,.d
Y,----z,\,-,-Phone: - '\� > 4%, -K_
N/A YES ,,NO
1.Required#of copies received V'
2.Date of soils exam and percolation test not older than 2 years Lam''
3.4-5 ft of naturally occurring pervious material, above water table z.--- '
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: �1".
5.Water line 10 ft from septic components Var.: k...------
6.
/6.Benchmark indicated and shown-NGVD if near wetlands L.-----
7.
�7. Septic tank minimum 10 ft from foundation, deck Var.: t___.-/
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: e,/'
9.Leaching minimum 100 ft from wetlands Var.: < -__
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ,e---
11.Tank/leaching minimum 10 ft from property line Var.: ,C/
12. System meets all other setback requirements Var.: C/' .
13.Uses adjustment for maximum high groundwater Var.: ` _ _
14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: L/
15. System not in top or subsoil(A,B horizons)or 5'removal
16.Proposed contours are suitable
17. System meets slope requirements-min. 1/8", 'A"preferred ......------
18.
--✓18. System meets breakout requirements PVC liner: Wall: cam`
19. Specified tee sizes are proper, gas baffle on outlet tee C ----
20.
20. Sewage is under 10,000 gpd for parcel c-------
21.No garbage disposal .(.---------
22.System adequately sized for its intended use k..-----
23.
V.-23.Minimum 6"stone or compacted below tank and dbox i,-----'
• 24.Manhole covers within 6"of grade,pump chamber cover to grade
25.Inspection port on plastic chambers/leach field `__,/
26.Electrical permit for pump chamber/Separate meter for duplexes `----
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size ,.....--
28.Septic tank/pump chamber to be factory waterproofed ...._-----
29.
129.Vent provided if leaching below 3 feet,under driveway/parking ----
30.Buoyancy calculations for tank/pump chamber .....31.Engineer to inspect and certify soils: wall: commercial: ,�� \
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature L.-----
33.H-20 loading is subject to vehicular traffic, groundwater -------
34.Title V Application and permit fee, installer signature
35.Foundation footing min.2 feet above adjusted ground water for new house ../-
36.Deed Restriction required max. #bedrooms: max. flow: gpd _.--- --
37.Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: (F---)' 6103/03