Loading...
HomeMy WebLinkAboutEngineer Certification Letter FBI\ CONSULTING ENGINEERS Hunter Engineering Associates,Inc. • 7 Weeks Pond Drive • Sandwich,MA 02644 • 508/477-8268 April 19, 2000 2ECre7. 9VIED APR 1 9 2000 HEALTH DEPT. Mr. Bruce Murphy, MPH Health Agent Town of Yarmouth 1146 Route 28 South Yarmouth, MA 02664 • Subj : 11 Windmill Lane Septic System Inspection Dear Mr. Murphy: Hunter Engineering Associates, has conducted the necessary inspections for the newly installed Title V septic system for the subject property. For the record, please note that the natural grade at the westerly edge of the driveway dropped off several inches, thereby, causing a portion the subsoil "B" layer to encroach by several vertical inches into the end of the newly installed (SAS) . At our site meeting on Tuesday, April 18, I conducted an additional soil evaluation of the "B" horizon in question. My soil evaluation of the "B" horizon concluded it to be a suitable, coarse grained, Class I, loamy sand. Additionally, a gooseneck pvc vent was installed at the distribution box. Also please be aware that breakout elevations were checked. No breakout is possible. Therefore, I hereby certify that the new septic system has been installed in conformance with the approved plan prepared by Hunter Engineering. • =r truly yours, 4ohn P. Hunter, P.E.