HomeMy WebLinkAboutEngineer Certification Letter FBI\ CONSULTING ENGINEERS
Hunter Engineering Associates,Inc. • 7 Weeks Pond Drive • Sandwich,MA 02644 • 508/477-8268
April 19, 2000 2ECre7. 9VIED
APR 1 9 2000
HEALTH DEPT.
Mr. Bruce Murphy, MPH
Health Agent
Town of Yarmouth
1146 Route 28
South Yarmouth, MA 02664
•
Subj : 11 Windmill Lane
Septic System Inspection
Dear Mr. Murphy:
Hunter Engineering Associates, has conducted the necessary inspections for the
newly installed Title V septic system for the subject property.
For the record, please note that the natural grade at the westerly edge of the
driveway dropped off several inches, thereby, causing a portion the subsoil "B"
layer to encroach by several vertical inches into the end of the newly installed
(SAS) .
At our site meeting on Tuesday, April 18, I conducted an additional soil
evaluation of the "B" horizon in question. My soil evaluation of the "B" horizon
concluded it to be a suitable, coarse grained, Class I, loamy sand.
Additionally, a gooseneck pvc vent was installed at the distribution box. Also
please be aware that breakout elevations were checked. No breakout is possible.
Therefore, I hereby certify that the new septic system has been installed in
conformance with the approved plan prepared by Hunter Engineering.
• =r truly yours,
4ohn P. Hunter, P.E.