Loading...
HomeMy WebLinkAboutReview Checklist �.2.6_(9 TOWN OF YARMOUTH . SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 1 4 Lot /6 Zone of Contribution: In Out L--Acreage ��� ` Commercial Residential: Street: . , Village: +.,,e/66 -York- i Floor Plan: #Bedroom--s:4L--- r' ' . Owner: 4 -en4 �/�/ 71 Installer: 0., ,, ‘ - Address: Phone: Phone: 4%.,)/-"L, cr•--t.-,-/S. ' S Builder: Engineer: G , Address: Phone: k, - S'-- 9 tZ Phone: ,),"2-`C C �sr c:r 17,._/,(„t_, Z' / ( -/. i �.. G4'/ 464-9L' NOV 1.Required# of copies received 2.Date of soils exam and percolation test not older than 2 years L, 3.4-5 ft of naturally occurring pervious material, above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5.Water line 10 ft from septic components Var.: L- J 6.Benchmark indicated and shown-NGVD if near wetlands ......----- 7. _7. Septic tank minimum 10 ft from foundation, deck Var.: 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 76 i L- 9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: L___-- 12. System meets all other setback requirements Var.: �, L.,---- 13. .-13.Uses adjustment for maximum high groundwater Var.: 7 6-1.---- --- 14.Leaching set 4-5 ft above adj. water or botto6�; test e Var.: L.L.---- 15. System not in top or subsoil(A,B horizons) 6-5 l (,. 16.Proposed contours are suitable '", 17. System meets slope requirements-min. 1/8", i "preferred 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee �- 20. Sewage is under 10,000 gpd for parcel _> 21.No garbage disposal 22. System adequately sized for its intended use I 23.Minimum 6"stone or compacted below tank and dbox . 24.Manhole covers within 6"of grade,pump chamber cover to grade 25.Inspection port on plastic chambers/leach field .....___-- 26. --26.Electrical permit for pump chamber/Separate meter for duplexes --- 27.Pump system-2" line,weep hole,check valve,tee in dbox, pump size 28. Septic tank/pump chamber to be factory waterproofed 29.Vent provided if leaching below 3 feet,under driveway/parking ---- 30.Buoyancy calculations for tank/pump chamber _./---- 31. /--^31.Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature ------- _ /_33.1-1-20 loading is subject to vehicular traffic, groundwater 34.Title V Application and permit fee, installer signature c---1 35.Foundation footing min. 2 feet above adjusted ground water for new house `----- 36.Deed Restriction required max. #bedrooms: max. flow: gpd ------- _ 37.Check area lots for groundwater/Label groundwater in Assessor's Map �-- i Plan reviewed by: Pi 6/03/03