HomeMy WebLinkAboutBLD-19-5328 .e,0..iz,J ,Olv 1/Ojj
V.
TOWN OF YARMOUTH Building Department BUILDING
e, _ ► (508) 398-2231 ext.1261
0 ` 4 PERMIT NO BLD 19 005328 PERMIT
fA ';' JOB WEATHER CARD
Alio,� 00 ISSUE DATE 03/25/2019
APPLICANT Paul Cazeault PERMIT TO Repair
AT(LOCATION) 7 GROVE ST,WEST YARMOUTH, MA 02673 ZONING DISTRICT [R-25j Bldg.Type: Residential
SUBDIVISION MAP BLOCK LOT 020.36 1 BUILDING IS TO BE: FCONST TYPE V B 1 USE GROUP R-3 1
REMARKS Repair Siding 7 sq ft(508-428-1177) k ^Yµ MpAM mMM — r mm CONTRACTOR i
I [103714
t
I LICENSE ,,
€ Home Improvement
l IPAUL J.CAZEAULT&SONS, INC. ,
`iPaul Cazeault
AREA(SQ FT) i 1 840 540 681 EST COST($) 4550 00 , PERMIT FEE($) 5000 I 1031 MAIN ST l
�- 1OSTERVILLE, MA 02658 i
OWNER [STOUT KENT A TR -.w ?
BUILDING DEPT BY I
ADDRESS GROVE STREET NOM TRUST 7 GROVE ST2.�.. M
WEST YARMOUTH lMA 102673T 1 PHONE „� _ s
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, OR SIDEWALK ANY PART THEREOF, EITHER TEMPORARILY OR
PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE
CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED FOR
FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE.WHERE ELECTRICAL PLUMBING/GAS
MEMBERS(READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL
3)FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED,SUCH BUILDING SHALL NOT BE INSTALLATIONS.
REFER TO DETAILED INSPECTION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS
BEEN MADE.
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
•
OTHER: I
WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD
UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE
APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION.
STAGES OF CONSTRUCTION ARm/F