HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH _/'
SEWAGE PLAN REVIEW CHECKLIST ( -, % /
Zone of Contribution: In._1+ ^ / Acreage 1_
Location: A.M. 9 J? Lot � 7 �'� g / , t
n �` Commercial: Residential: l_�
r
Street: l 7 €"( s Ce,,,E..6 /
Village: Floor Plan: (.� #Bedrooms:
Owner: 703-1(( c A Installer:
Address: Phone:
Phone: 71 6 S�"'- 7e)
Builder: Engineer: � O-z , 1 ..----1,.
�� 4
Address: / Phone: ) 2 -gS
Phone: ✓ . I✓?1e-ite-
N/A YES NO
1.Required#of copies received (...-----
2.Date of soils exam and percolation test not older than 2 years 4.......-------
3.4-5
---
3.4-5 ft of naturally occurring pervious material, above water
4.Foundation 2 ft above high point of road H.P.: 7 'JFnd: 17 Var.: 1
5.Water line 10 ft from septic components Var.: (r/
6.Benchmark indicated and shown-NGVD if near wetlands L.-------
7. Septic tank minimum 10 ft from foundation, deck Var.: ✓'
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: a....------
9.Leaching minimum 100 ft from wetlands Var.:
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11.Tank/leaching minimum 10 ft from property line Var.: t_.._.---
12. System meets all other setback requirements Var.: 1/4....L.----
13.Uses adjustment for maximum high groundwater Var.: ....----
14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: k....----
15.
....--15. System not in top or subsoil(A,B horizons) or 5'removal
16.Proposed contours are suitable
17. System meets slope requirements-min. 1/8", '/a"preferred - -�"
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee (-------"'
20. Sewage is under 10,000 gpd for parcel '........---
21.
,....21.No garbage disposal t------- '
22.
------
22. System adequately sized for its intended use
23.Minimum 6"stone or compacted below tank and dbox -
24.Manhole covers within 6"of grade, pump chamber cover to grade
25.Inspection port on plastic chambers/leach field �..---
26.Electrical permit for pump chamber/Separate meter for duplexes --"
27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size =---
28.
"28. Septic tank/pump chamber to be factory waterproofed
29.Vent provided if leaching below 3 feet,under driveway/parking
30.Buoyancy calculations for tank/pump chamber ..-----
31.Engineer to inspect and certify soils: wall: commercial: ---
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature �-_'
33. H-20 loading is subject to vehicular traffic, groundwater _.--/- r >,
34.Title V Application and permit fee, installer signature
35.Foundation footing min. 2 feet above adjusted ground water for new house ----
36.Deed Restriction required max. #bedrooms: max. flow: gpd -----
37.Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: 1 6/03/03