Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH _/' SEWAGE PLAN REVIEW CHECKLIST ( -, % / Zone of Contribution: In._1+ ^ / Acreage 1_ Location: A.M. 9 J? Lot � 7 �'� g / , t n �` Commercial: Residential: l_� r Street: l 7 €"( s Ce,,,E..6 / Village: Floor Plan: (.� #Bedrooms: Owner: 703-1(( c A Installer: Address: Phone: Phone: 71 6 S�"'- 7e) Builder: Engineer: � O-z , 1 ..----1,. �� 4 Address: / Phone: ) 2 -gS Phone: ✓ . I✓?1e-ite- N/A YES NO 1.Required#of copies received (...----- 2.Date of soils exam and percolation test not older than 2 years 4.......------- 3.4-5 --- 3.4-5 ft of naturally occurring pervious material, above water 4.Foundation 2 ft above high point of road H.P.: 7 'JFnd: 17 Var.: 1 5.Water line 10 ft from septic components Var.: (r/ 6.Benchmark indicated and shown-NGVD if near wetlands L.------- 7. Septic tank minimum 10 ft from foundation, deck Var.: ✓' 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: a....------ 9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: t_.._.--- 12. System meets all other setback requirements Var.: 1/4....L.---- 13.Uses adjustment for maximum high groundwater Var.: ....---- 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: k....---- 15. ....--15. System not in top or subsoil(A,B horizons) or 5'removal 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", '/a"preferred - -�" 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee (-------"' 20. Sewage is under 10,000 gpd for parcel '........--- 21. ,....21.No garbage disposal t------- ' 22. ------ 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox - 24.Manhole covers within 6"of grade, pump chamber cover to grade 25.Inspection port on plastic chambers/leach field �..--- 26.Electrical permit for pump chamber/Separate meter for duplexes --" 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size =--- 28. "28. Septic tank/pump chamber to be factory waterproofed 29.Vent provided if leaching below 3 feet,under driveway/parking 30.Buoyancy calculations for tank/pump chamber ..----- 31.Engineer to inspect and certify soils: wall: commercial: --- 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature �-_' 33. H-20 loading is subject to vehicular traffic, groundwater _.--/- r >, 34.Title V Application and permit fee, installer signature 35.Foundation footing min. 2 feet above adjusted ground water for new house ---- 36.Deed Restriction required max. #bedrooms: max. flow: gpd ----- 37.Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: 1 6/03/03