HomeMy WebLinkAbout2018 Jul 17 - Email to Engineer vonHone, Amy
From: vonHone,Amy
Sent: Tuesday,July 17, 2018 2:46 PM
To: 'dgonsalves@downcape.com'; 'Craig J. Ferrari, EIT'
Subject: 75 Sisters Circle
Danny/Craig-
A couple of things on this one:
1. Foundation variance will be needed (high point of the fronting road is not 2' below the TOF). The variance will
be approved in-house but it will need to be listed on the plan.
2. Check you breakout elevation on the southeasterly corner of the leach facility. If you are using the elevation of
the top of concrete on the chambers,you don't quite make it.
Call or email with questions.
Thanks,Amy
Amy L.von Hone,R.S.,C.H.O.
Assistant Health Director
Yarmouth Health Department
1146 Route 28
South Yarmouth, MA 02664
(W)508.398.2231 X1240
(F) 508.760.3472
avonhone@yarmouth.ma.us
1