HomeMy WebLinkAboutReview Checklist 7-1 5 ,(yzice 22-
TOWN OF YARMOUTH i/�� ge,/
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. re--6 Lot Zone of Contribution: In_c__...Qtrt- ` Acreage:?/
Commercial: Residential:
Street: s ied/ 2
Village: J . Q 'jV Floor Plan: l.' #Bedrooms: -./
Owner: �,'G?'I'' til/1,0 V�� Installer: 4Jme,'
Address: Phone: e'er - f j2 D 5-3 D
Phone:
7A'S� ��
Builder: Engineer: �
Address: Phone: - �� ....47_,'
Phone: ..--/G 1 VAI,i1A5 // 0��. 9i�10�u�
N/A YES NO v
1.Required#of copies received %..---------
2.
om/2. Date of soils exam and percolation test not older than 2 years L..-----
3. 4-5 ft of naturally occurring pervious material, above water table Ls----
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5.Water line 10 ft from septic components Var.: L`/
6.Benchmark indicated and shown-NGVD if near wetlands L..------ _
7. Septic tank minimum 10 ft from foundation, deck Var.:
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9.Leaching minimum 100 ft from wetlands Var.: '-
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: �-
11.Tank/leaching minimum 10 ft from property line Var.: �----•
12. System meets all other setback requirements Var.:
13.Uses adjustment for maximum high groundwater Var.: �� j %�
14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: /. C�->
15. System not in top or subsoil(A,B horizons)or 5' removal L-----".
16.Proposed contours are suitable C..----"
17. System meets slope requirements-min. 1/8", 1/4"preferred k....-----
18.
.,i18. System meets breakout requirements PVC liner: Wall: L...-/'
19. Specified tee sizes are proper, gas baffle on outlet tee C-.----
20.
f20. Sewage is under 10,000 gpd for parcel L/
21.No garbage disposal
22. System adequately sized for its intended use (....®i
23.Minimum 6" stone or compacted below tank and dbox L.-- .
24.Manhole covers within 6"of grade,pump chamber cover to grade ‘..._..----
25. Inspection port on plastic chambers/leach field ��
26. Electrical permit for pump chamber/Separate meter for duplexes -____.. ' .
27.Pump system-2" line,weep hole,check valve,tee in dbox, pump size ----------.
28. Septic tank/pump chamber to be factory waterproofed ...-----'
29.Vent provided if leaching below 3 feet,under driveway/parking
30.Buoyancy calculations for tank/pump chamber ,/'
31.Engineer to inspect and certify soils: wall: commercial:
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature kit-2› )
33. H-20 loading is subject to vehicular traffic, groundwater \-/
34.Title V Application and permit fee, installer signature - �.....---•
35.Foundation footing min. 2 feet above adjusted ground water for new house
36.Deed Restriction re•uired max. #bedrooms: max. flow: Li.d
37.Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: eiO3iO3