HomeMy WebLinkAboutReview Checklist �7TOWN OF YARMOUTH. ' . =�
SEWAGE PLAN REVIEW CHECKLIST / � ��
Location: A.M. Lot
: S Zone of Contribution: In vC)ut Acreage /0, ZZ-r
Commercial: Residential: i..-L------
Street:
Village: 1/. 14(41347 Floor Plan: ✓ #Bedrooms: 2_
Owner: jerdidkirri Installer: 7
Address: Phone:
Phone: 2 6 /f
/ s/ --e-
Builder: Engineer:/ C ,
Address: Phone: (.- 1-- 'C
Phone: )c e' -1 ti X.-,(2-
N/A YES NO
1.Required# of copies received y--'"-
2.Date of soils exam and percolation test not older than 2 years L.---
3.4-5
.--
3.4-5 ft of naturally occurring pervious material, above water table -_-
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: /
5.Water line 10 ft from septic components Var.: (....-___----
6.Benchmark indicated and shown-NGVD if near wetlands .c--= "
7. Septic tank minimum 10 ft from foundation, deck Var.: L-----
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: k.....--
,
t --
9.Leaching minimum 100 ft from wetlands Var.: --
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 1 -
11.Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.: ._.-
13.Uses adjustment for maximum high groundwater Var.:
14.Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 1
15. System not in top or subsoil(A,B horizons)or 5'removal
16.Proposed contours are suitable L.---
17. System meets slope requirements-min. 1/8", ' "preferred --
18. System meets breakout requirements PVC liner: Wall: �____
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel
k.21.No garbage disposal �_�
22. System adequately sized for its intended use
23.Minimum 6"stone or compacted below tank and dbox L-„e,,.-
24.Manhole covers within 6"of grade,pump chamber cover to grade (..---
25.Inspection port on plastic chambers/leach field -=
26.Electrical permit for pump chamber/Separate meter for duplexes ---�
27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size _____,
28. Septic tank/pump chamber to be factory waterproofed ,_,_
29.Vent provided if leaching below 3 feet, under driveway/parking
30.Buoyancy calculations for tank/pump chamber
31.Engineer to inspect and certify soils: wall: commercial: •32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33.H-20 loading is subject to vehicular traffic, groundwater ...___--
34.
.-34.Title V Application and permit fee, installer signature �J
35.Foundation footing min. 2 feet above adjusted ground water for new house
36.Deed Restriction required max. #bedrooms: -- max. flow: J gpd
37.Check area lots for groundwater/Label groundwater in Assessor's Map l_../
Plan reviewed by:
,e-v 6/03/03
-_-_
, .
, 6Th-0-1, /' '26
i
, (
i
i
1 , _ 1
___------------- ' '