HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. I Lott c Zone of Contribution: In_ Out C ages_
Commercial: Residential:
Street:
Village: yar Floor Plan: #Bedrooms: 3
Owner: Installer: lea 5
€Address: Phone:
-OP/
2-
Phone:Phone:
Builder: Engineer: ^"
Address: Phone: J'--
Phone: )3.60c < te
N/A YES NO
1.Required#of copies received
2. Date of soils exam and percolation test not older than 2 years
3. 4-5 ft of naturally occurring pervious material, above water table
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5. Water line 10 ft from septic components Var.:
6.Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.: �.
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: L�
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11. Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.: L�
13. Uses adjustment for maximum high groundwater Var.: L
14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.:
15. System not in top or subsoil(A,B horizons) or 5' removal L�
16.Proposed contours are suitable
17. System meets slope requirements-min. 1/8", 1/4"preferred L�-
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal
-22. System adequately sized for its intended use
23.Minimum 6"stone or compacted below tank and dbox
24.Manhole covers within 6"of grade,pump chamber cover to grade
25.Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexes
27.Pump system-2" line,weep hole,check valve,tee in dbox, pump size
28. Septic tank/pump chamber to be factory waterproofed
29.Vent provided if leaching below 3 feet, under driveway/parking •
30.Buoyancy calculations for tank/pump chamber
31.Engineer to inspect and certify soils: wall: commercial:
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33.H-20 loading is subject to vehicular traffic, groundwater
34. Title V Application and permit fee, installer signature
35.Foundation footing min. 2 feet above adjusted ground water for new house ---
36.Deed Restriction required max. #bedrooms: max. flow: gpd /�-
37.Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: e F