Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. I Lott c Zone of Contribution: In_ Out C ages_ Commercial: Residential: Street: Village: yar Floor Plan: #Bedrooms: 3 Owner: Installer: lea 5 €Address: Phone: -OP/ 2- Phone:Phone: Builder: Engineer: ^" Address: Phone: J'-- Phone: )3.60c < te N/A YES NO 1.Required#of copies received 2. Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material, above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: 6.Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: �. 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: L� 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: L� 13. Uses adjustment for maximum high groundwater Var.: L 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons) or 5' removal L� 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 1/4"preferred L�- 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal -22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox 24.Manhole covers within 6"of grade,pump chamber cover to grade 25.Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2" line,weep hole,check valve,tee in dbox, pump size 28. Septic tank/pump chamber to be factory waterproofed 29.Vent provided if leaching below 3 feet, under driveway/parking • 30.Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic, groundwater 34. Title V Application and permit fee, installer signature 35.Foundation footing min. 2 feet above adjusted ground water for new house --- 36.Deed Restriction required max. #bedrooms: max. flow: gpd /�- 37.Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: e F