Loading...
HomeMy WebLinkAboutReview Checklist fel - if TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 7/ Lot TV Zone of Contribution: In Out eage . 7/ , 5%� d Commercial: Residential: ,-----' . Street: Village: Yoeii• Floor Plan: t #Bedrooms: 14 94,, A it e.._(#v171 � Installer: L=!/GL 5-- 5ceco w '5 ef14j Address: Phone: Phone:Builder: Engineer: 6C,- Address: Phone: 7e " f/9 Phone: /kW k :( / �r� y v`W ( %Ji �N/A YES NO 1.Required# of copies received 2. Date of soils exam and percolation test not older than 2 years L- 3. 4-5 ft of naturally occurring pervious material, above water table L/' 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: k_...----' 5. Water line 10 ft from septic components Var.: t./' 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 3 ' cy (---- 9. Leaching minimum 100 ft from wetlands Var.: �-- 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: ?- i �0___ c....---- 12. System meets all other setback requirements Var.: _ 13. Uses adjustment for maximum high groundwater Var.: \----- 14. Leaching set 4-5 ft above adj.water or bottom of test hole Var.: f 15. System not in top or subsoil(A,B horizons) or 5' removal l./ 16.Proposed contours are suitable ti--- 17. System meets slope requirements-min. 1/8", '/4"preferred Ll 18. System meets breakout requirements PVC liner: Wall: N.----- 19. .-119. Specified tee sizes are proper, gas baffle on outlet tee ......--- 20. Sewage is under 10,000 gpd for parcel _ �� 21.No garbage disposal `,-- 22. System adequately sized for its intended use L.----- 23.Minimum 6"stone or compacted below tank and dbox ...,---- • 24.Manhole covers within 6"of grade,pump chamber cover to grade `-•---• 25. Inspection port on plastic chambers/leach field -..........-- 26. .._�26. Electrical permit for pump chamber/Separate meter for duplexes �- 27.Pump system-2" line,weep hole,check valve, tee in dbox, pump size 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet, under driveway/parking � 30.Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33. H-20 loading is subject to vehicular traffic, groundwater 34. Title V Application and permit fee, installer signature - C� 35.Foundation footing min. 2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpd O 37. Check area lots for groundwater/Label groundwater in Assessor's Map J Plan reviewed by: (C1).../ eiO3iO3