HomeMy WebLinkAboutReview Checklist fel - if TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. 7/ Lot TV Zone of Contribution: In Out eage .
7/ , 5%� d Commercial: Residential: ,-----' .
Street:
Village:
Yoeii• Floor Plan: t #Bedrooms: 14 94,,
A it
e.._(#v171 � Installer: L=!/GL 5-- 5ceco w
'5 ef14j
Address: Phone:
Phone:Builder: Engineer: 6C,-
Address: Phone: 7e " f/9
Phone: /kW
k :(
/ �r� y v`W ( %Ji
�N/A YES NO
1.Required# of copies received
2. Date of soils exam and percolation test not older than 2 years L-
3. 4-5 ft of naturally occurring pervious material, above water table L/'
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: k_...----'
5. Water line 10 ft from septic components Var.: t./'
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.:
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 3 ' cy (----
9. Leaching minimum 100 ft from wetlands Var.: �--
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11. Tank/leaching minimum 10 ft from property line Var.: ?- i �0___ c....----
12. System meets all other setback requirements Var.: _
13. Uses adjustment for maximum high groundwater Var.: \-----
14. Leaching set 4-5 ft above adj.water or bottom of test hole Var.: f
15. System not in top or subsoil(A,B horizons) or 5' removal l./
16.Proposed contours are suitable ti---
17. System meets slope requirements-min. 1/8", '/4"preferred Ll
18. System meets breakout requirements PVC liner: Wall: N.-----
19.
.-119. Specified tee sizes are proper, gas baffle on outlet tee ......---
20. Sewage is under 10,000 gpd for parcel _ ��
21.No garbage disposal `,--
22. System adequately sized for its intended use
L.-----
23.Minimum 6"stone or compacted below tank and dbox ...,----
•
24.Manhole covers within 6"of grade,pump chamber cover to grade `-•---•
25. Inspection port on plastic chambers/leach field -..........--
26.
.._�26. Electrical permit for pump chamber/Separate meter for duplexes �-
27.Pump system-2" line,weep hole,check valve, tee in dbox, pump size
28. Septic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet, under driveway/parking �
30.Buoyancy calculations for tank/pump chamber
31.Engineer to inspect and certify soils: wall: commercial:
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33. H-20 loading is subject to vehicular traffic, groundwater
34. Title V Application and permit fee, installer signature - C�
35.Foundation footing min. 2 feet above adjusted ground water for new house
36. Deed Restriction required max. #bedrooms: max. flow: gpd O
37. Check area lots for groundwater/Label groundwater in Assessor's Map J
Plan reviewed by:
(C1).../
eiO3iO3