Loading...
HomeMy WebLinkAboutReview Checklist TOWN QF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Lot 9f Zone of Contribution: In_ Out '-" Acreage Commercial: Residential:,o Street: 6�/1 /i// . - 4*/ Village: (JJ'_ � , Floor Plan: /// # Bedrooms: 5 Owner: I'or l-(-, 4a_ Installer: d daldiC Address: Phone: c-a- 4 -2 SS,t Phone: � ` %f ; t41` -- / <¶/rS ' Builder: Engineer: V Address: Phone: 5-- 3G L - �C j - Phone: Tiij,X /-7-,-.-'3(Y Ck= ,Z4' G7c_.-- N/A YES NO 1. Required#of copies received - 1.40"' 2. Date of soils exam and percolation test not older than 2 years L.----- 3. _..3. 4-5 ft of naturally occurring pervious material, above water table t......---- 4. ../4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: t....----- 6. _/6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: L�.i' 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: `.../ 11. Tank/leaching minimum 10 ft , from property line Var.: ( ,`1!_ 776-(--fZL C _-%' ---' 12. System meets all other setback requirements Var.: tom,/ 13. Uses adjustment for maximum high groundwater Var.: �- . 14. Leaching set 4-5 ft above adj. water or bolt of test holes ,Var.: i �,� 15. System not in top or subsoil(A,B horizons) r 5' remgyal' 16.Proposed contours are suitable t.....---- 17. /17. System meets slope requirements-min. 1/8", '/4"preferred k..--- 18. _f18. System meets breakout requirements PVC liner: Wall: ,,/" 19. Specified tee sizes are proper, gas baffle on outlet tee l------ 20. Sewage is under 10,000 gpd for parcel t....---- 21.No garbage disposal 1/4.....---- , 22. System adequately sized for its intended use ---- 23. Minimum 6"stone or compacted below tank and dbox 24. Manhole covers within 6"of grade, pump chamber cover to grade I„_--- 25. Inspection port on plastic chambers/leach field L�--.-- 26. Electrical permit for pump chamber/Separate meter for duplexes 27. Pump system-2" line,weep hole,check valve,tee in dbox,pump size .---- 28. Septic tank/pump chamber to be factory waterproofed _----- 29. Vent provided if leaching below 3 feet, under driveway/parking 30. Buoyancy calculations for tank/pump chamber �. 31. Engineer to inspect and certify soils: wall: commercial: .------ 32. �32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33. H-20 loading is subject to vehicular,traffic, groundwater ____,-- 34. �34. Title V Application and permit fee, installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house - --- 36. Deed Restriction required max. #bedrooms: max. flow: gpd_ ------- -,..- 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: cl; ' 6/03/03