HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH /e),,61;
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. /O S Lot
Zone of Contribution: Ig.Q Out Acreage Q� ./9//-6Z-&--3
Commercial: `` Residential {)
Street: �!%epluit f /
Village: (,(f (fT Floor Plan: C/ #Bedroomsf--5
Owner:
Installer: 4 60.47-,A.Lf&Address: Phone: -77 /5
Phone:
Builder: • Engineer: 4p r// GG C��/
Address: Phone: L /'w9>---2-
Phone:
N/A YES NO
1.Required#of copies received
' 2. Date of soils exam and percolation test not older than 2 years (....-------
3.4-5 ft of naturally occurring pervious material,above water table
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: ,___----
• 5. Water line 10 ft from septic components Var.: (....------
6.
,/6.Benchmark indicated and shown-NGVD if near wetlands i..------
1 7. Septic tank minimum 10 ft from foundation, deck Var.: L.--/
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: l '
9.Leaching minimum 100 ft from wetlands Var.: c-/"."'
10.Leaching minimum 150 ft from drinkingwell/25 ft irrigation well Var.: i/
11. Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.: ‘....-----
13.
./13. Uses adjustment for maximum high groundwater Var.: �./
14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: c__.-)
15. System not in top or subsoil(A,B horizons)or 5'removal
16.Proposedcontours are suitable
f1817. System meets slope requirements-min. 1/8", 'A"preferred L.--------
18.
. System meets breakout requirements PVC liner: Wall: L-------
19. Specified tee sizes are proper,gas baffle on outlet tee i
20. Sewage is under 10,000 gpd for parcel l
21.No garbage disposal `�
- 22.System adequately sized for its intended use (__-----"-
23.Minimum 6"stone or compacted below tank and dbox \----""
24.Manhole covers within 6"of grade,pump chamber cover to grade �/
25.Inspection port on plastic chambers/leach field ��r--
26.Electrical permit for pump chamber/Separate meter for duplexes _..----'
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size __---•
28. Septic tank/pump chamber to be factory waterproofed �.---
29. Vent provided if leaching below 3 feet, under driveway/parking -/
30. Buoyancy calculations for tank/pump chamber
31.Engineer to inspect and certify soils: wall: commercial: -----...
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature ‘.....------
33. H-20 loading is subject to vehicular traffic, groundwater ./
_34. Title V Application and permit fee,installer signature _ '
35.Foundation footing min. 2 feet above adjusted ground water for new house <•�
36. Deed Restriction required max. #bedrooms: max flow: gpd
37. Check area lots for groundwater/Label groundwater in Assessor's Ma
Plan reviewed by: e&
6/03/03