Loading...
HomeMy WebLinkAboutReveiw Checklist r s TOWN OF YARMOUTH 76 4 SEWAGE PLAN REVIEW CHECKLIST Location: AM 04 LOT LZ 7 Date of Subdivision Approval Street c24/16e7 '"/ 7 3 %t-.9" Zone of Contribution: In Village G�2 Commercial Residential 'J / Owner: / �C ez/-PILI07Installer T '-. S- 9_-3 Builder: / Engineer / 4 3'S---- N/A YES NO 1. Required number of copies received, t../ 2. Date of soils exam and percolation test not older than 2 years. 3. 4 feet of naturally occurring pervious material, above water table(new construction) 4. Foundation 2 feet above high point of fronting road for new construction. 5. Water availability letter from Water Department for new construction. 6. Benchmark indicated and shown-NGVD if near wetlands. 7. Building sewer does not exit center of house. I/ 8. Septic tank a minimum of 10 feet from house and deck. 1. -"- 9. Leaching a minimum of 20 feet from house and 10 feet from deck. L/ 10, Leaching a minimum of 100 feet from wetlands. 11. Leaching a ' ' um of 150 feet from drinking wells/25 feet from irrigation wells. .�� 12. System meets all other setback requirements. t/ 13. Uses adjustment for maximum high groundwater. f 14. Leaching 4 -5 feet above adjusted water table or bottom of test pit. 15. System not in top or subsoil or 5 foot removal. 16. Proposed contours are suitable. tv./- 17. System meets slope requirements - min. 1/8", 1/4" preferred. 18. System meets breakout requirements- peastone elevation carried out 15 feet minimum. ✓ .19. Specified tee sizes are proper, gas baffle on outlet tee. iV 20. Sewage flow under 10.000 gpd for parcel, v/ 21. No garbage disposal. f .22. System adequately sized for its intended use. 23. Minimum 6" stone or mechanically compacted below the tank and d-box. 24. Manhole covers within 6" of grade - septic tank and pump chamber. ✓'`" 25. Electrical permit for pump chamber. :/- 26. Pump system - 2" line, weep hole. check valve sanitary in d-box. alarm on separate circuit. 27. Septic tank and pump chamber to be Factory waterproofed. t/ 28. Vent provided if leachinn below 3 feet or under driveway or parking, L./� 29. Engineer to inspect and certify : a. clay removal b. wall construction schedule c: commercial system (/ 30. Engineer and Land Surveyor stamp and signature. S 31. H2O loading when system subject to vehicular traffic. f 32. Title V application and fee signed by a licensed installer. 33. Foundation footing 2 feet above adjusted water table. 34. Lot subdivided prior to July 31. 1986 - Nitrate Loading, 5. Subdivided .ri.r to A. ' 7 19' • - Phos silo . s 10'. Plan reviewed by: &....-, E I s E I I I I f s 4 f i