Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH .E- - / 24, SEWAGE PLAN REVIEW CHECKLIST Location: AM /D6 LOT /2_ Date of Subdivision Approval // 2c . StreetZ� / f Zone of Contribution: In e Out Village yort-- � Commercial Residential Owner: /10(6.d 49frf-y Installer x-74 Builder: Engineer ,,h/' %' /941 ? 77 S---- Z7,3 c"--- N/A YES NO 1. Required number of copies received. 2. Date of soils exam and percolation test not older than 2 years. 3. 4 feet of naturally occurring pervious material, above water table(new construction) 1 4. Foundation 2 feet above high point of fronting road for new construction. ,.....---- 5, ./5. Water availability letter from Water Department for new construction. 6. Benchmark indicated and shown-NGVI) if near wetlands. 7. Building sewer does not,exit center of house. / 8. Septic tank a minimum of 10 feet From house and deck. ✓ 9. Leaching a minimum of 20 feet from house and 10 feet from deck. 10. Leaching a minimum of 100 feet from wetlands. 11. Leaching a minimum of 150 feet from drinking wells/25 feet from irrigation wells. 12. System meets all other setback requirements. 13. Uses adjustment for maximum high groundwater. "✓ 14. Leaching 4 -5 feet above adjusted water table or bottom of test pit. 15. System not in top or subsoil or 5 foot removal. a 16. Proposed contours are suitable. 17. System meets slope requirements - min. 1/8". 1/4" preferred. ../ 18. System meets breakout requirements- peastone elevation carried out 15 feet minimum. 19. Specified tee sizes are proper. gas baffle on outlet tee. <20. Sewage flow under 10.000 Bpd for parcel. ,�/ 21. No garbage disposal. ✓ 22. System adequately sized for its intended use. 23. Minimum 6" stone or mechanically compacted below the tank and d-box. 24. Manhole covers within 6" of grade - septic tank and pump chamber. 25. Electrical permit for pump chamber, <./ 26. Pump system- 2" line. weep hole. check valve. sanitary in d-box, alarm on separate circuit. 27. Septic tank and pump chamber to be Factory waterproofed. f 28. Vent provided if leaching below 3 feet or under driveway or parking. 29. Engineer to inspect and certify : a. clay removal b. wall construction schedule c. commercial system 30. Engineer and Land Surveyor stamp and signature. �/ 31. H20 loadinT when system subject to vehicular traffic. / 32. Title V applicationt and fee signed by a licensed installer. ,.� 33. Foundation footing 2 feet above adjusted water table. 34. Lot subdivided prior to July 31. 1986 - Nitrate Loading, 35. Subdivided prior to April 7. 19_89 - Phosphorus one 300'. ,...., Plan reviewed by: