HomeMy WebLinkAboutReview Checklist 1111/O 'or-(
TOWN OF YARMOUTH
1 SEWAGE PLAN REVIEW CHECKLIST "
Location: A.M. l.),7 Lot --72.-- Zone of Contribution: In Out `- creage
/--Cetti
Commercial: Residential: v,
Street:
Village: 1 Floor Plan: #Bedrooms:
Owner: /, I /':
���1 �Ld���e� Installer: �����-�C�
Address: Phone: ceP,3 -
Phone:
Builder: Engineer: ' / pE /,
Address: Phone: �l •
�„ 3_ ,
Phone: / --/('./, 2k c
N/A YES NO
1.Required#of copies received s-"
2.Date of soils exam and percolation test not older than 2 years L.--
3.4
_-.3.4-5 ft of naturally occurring pervious material, above water table
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: L__-----
5.Water line 10 ft from septic components Var.: ‘...--
6.Benchmark indicated and shown-NGVD if near wetlands l__..---
7. Septic tank minimum 10 ft from foundation, deck Var.: t„.:...----
8.
.8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: t.. ----'1
9.Leaching minimum 100 ft from wetlands Var.:
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: -,...
11.Tank/leaching minimum 10 ft from property line Var.: LL
12. System meets all other setback requirements Var.: Lam/
13.Uses adjustment for maximum high groundwater Var.: c _
14.Leaching set 4-5 ft above adj. water or bottom 91..tet hole Var.: L---"
15. System not in top or subsoil(A,B horizons) o 5' remova (.....-----
16.
-
16.Proposed contours are suitable r.--_ .
17. System meets slope requirements-min. 1/8", '/4"preferred (..---
18. System meets breakout requirements PVC liner: Wall: 4.._--
19. Specified tee sizes are proper, gas baffle on outlet tee c.....__--
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal
22. System adequately sized for its intended use ..----
23.Minimum 6"stone or compacted below tank and dbox
24.Manhole covers within 6"of grade, pump chamber cover to grade \-_-•
25.Inspection port on plastic chambers/leach field ‘...._____
26.Electrical permit for pump chamber/Separate meter for duplexes -,----
27.Pump system-2" line,weep hole,check valve,tee in dbox, pump size
28. Septic tank/pump chamber to be factory waterproofed . --
29.Vent provided if leaching below 3 feet, under driveway/parking _=
30.Buoyancy calculations for tank/pump chamber
31.Engineer to inspect and certify soils: wall: commercial: ------_
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature _ ------
33.H-20 loading is subject to vehicular traffic,groundwater c----
34.Title V Application and permit fee, installer signature ----,
35.Foundation footing min. 2 feet above adjusted ground water for new house _ , c„_✓-
36.Deed Restriction required max. #bedrooms: max. flow: gpd
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: 6
6/03/03