Loading...
HomeMy WebLinkAboutReview Checklist Nig- TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. /.)--(5 Lot Zone of Contribution: In_ Out Acreage S ii Street: Residential: Street: --9 Village: Floor Plan: #Bedrooms: Owner: Installer: 7- f7 5 #t Address: Phone: )76 2,- 6 L-j 1 Phone: r Builder: Engineer: �Lt Address: Phone: -C - ?Z Phone: - '>._ V bateA ial, N/A YES / NO 1.Required#of copies received `/ 2. Date of soils exam and percolation test not older than 2 years C./ 3. 4-5 ft of naturally occurring pervious material,above water table L.------ 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: t----- 5. Water line 10 ft from septic components Var.: (..---- 6.Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: ��✓ 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: l 9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: �---- 11.Tank/leaching minimum 10 ft from property line Var.: � .----- 12. System meets all other setback requirements Var.: �.----` 13.Uses adjustment for maximum high groundwater Var.: L...--------- 14. /14.Leaching set 4-5 ft above adj.water or bolt' o test o *. .: ✓ 15. System not in top or subsoil(A,B horizons or 5'removal _...- -- 16.Proposedcontours are suitable ._.-- 17. _/17.System meets slope requirements-min. 1/8", 'A"preferred �� 18. System meets breakout requirements PVC liner: Wall: ..�� 19. Specified tee sizes are proper,gas baffle on outlet tee �------ O. Sewage is under 10,000 gpd for parcel L---" 21.No garbage disposal L/ ''42. System adequately sized for its intended use c/ X13.Minimum 6"stone or compacted below tank and dbox �/ 24.Manhole covers within 6"of grade, pump chamber cover to grade 1 25. Inspection port on plastic chambers/leach field 26.Electrical permit for pump chamber/Separate meter for duplexes :../ 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size -_.----' 28. Septic tank/pump chamber to be factory waterproofed 29.Vent provided if leaching below 3 feet,under driveway/parking ......---- 30. /30. Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature _.....----- 33. �33.H-20 loading is subject to vehicular traffic, groundwater 34.Title V Application and permit fee, installer signature ------ 35.Foundation footing min. 2 feet above adjusted ground water for new house ------ --- 36. 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: 6/03/03