HomeMy WebLinkAboutHigh Ground Water Level Computation.-
R . Fermit hu-iber : Gale:• -
Completed by : - Ts.
t
HIGH GROUND-WATER LEVEL COMPUTATION
1 �, e— /`-v, G(/' J"''�C�,. Lot No.
Site Location: l
Own er: 4f91-7.--� Address:_
Contractor: Address:
Notes:
STEP 1 Measure depth to water table 7/ Zo/s3 55to nearest 1/10 ft . - date
h..
STEP 2 Using Water-Level Range Zone ./
and Index Well Map locate
site and determine:
A) Appropriate index well
kod 89
Water—level—range zone 1 13
STEP 3 Usino monthly report "Current
Water Resources Conditions" .
determine current depth to r)-2, c55 1...I
water level for index well /
mo yr
•
STEP 4 Using Table 'of Water-level
he justments fore index well
(STEP 2A) , current depth to . ,
%:iter level for index well
(S1EF 3) , and water- levelZ f•
zone (STEP 2B) determine
water-level adjustment
FIEF, 5 Estimate depth .to hioh water `
h: subtracting the water- ,
level adjustment (STEP 4) !0.
from measured depth to water - _-3.
level at site (STEP 1 )
�.- a . 2CD of Sr .