HomeMy WebLinkAboutReview Checklist 7.0
-,e - 7g-IGi TOWN OF YARMOUTH a--• SEWAGE PLAN REVIEW CHECKLIST '9
,1
Location: A.M. �4 Lot 7� Zone of Contribution: In - Acreage ����F
/ 67,, .,„.„,/4„-„,,,, Commercial: Residential ‘.i
®
Street: /
Village: (��i Floor Plan: ✓ #Bedrooms: 3
Owner: A41,4 Ade' Installer: /b 4.,"
Address: Phone: P- - -- - 0 s-- -o
Phone: 41/47.--//idege,--_,Builder: Engineer: �j Address: Phone: 9� 1f _5a¢-- ig
Phone:
N/A YES NO
1.Required#of copies received L.------
2.
02. Date of soils exam and percolation test not older than 2 years (.----'-
3. 4-5 ft of naturally occurring pervious material, above water table L--`
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: ��-----
5. Water line 10 ft from septic components Var.: L®.
6.Benchmark indicated and shown-NGVD if near wetlands L_... _
7. Septic tank minimum 10 ft from foundation, deck Var.: L.---
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: L�
9. Leaching minimum 100 ft from wetlands Var.: L__.-
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: e.----
11.
/11. Tank/leaching minimum 10 ft from property line Var.: L_.--.
12. System meets all other setback requirements Var.:
13. Uses adjustment for maximum high groundwater Var.: -
14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: L®
15. System not in top or subsoil(A,B horizons)or 5' removal (..---
16.Proposed contours are suitable C----
17.
v17. System meets slope requirements-min. 1/8", 1/4'preferred (...---
18. System meets breakout requirements PVC liner: Wall: L,,,-
19. Specified tee sizes are proper, gas baffle on outlet tee (....----
20. Sewage is under 10,000 gpd for parcel c___.---
21.No garbage disposal ...____.
- 22. System adequately sized for its intended use %-__---
23.Minimum 6"stone or compacted below tank and dbox (......----
24.
124.Manhole covers within 6"of grade,pump chamber cover to grade k..----'
25. Inspection port on plastic chambers/leach field L_---.
26. Electrical permit for pump chamber/Separate meter for duplexes c....-----
27.Pump system-2" line,weep hole,check valve, tee in dbox, pump size ._.----
28. Septic tank/pump chamber to be factory waterproofed --------
29. Vent provided if leaching below 3 feet, under driveway/parking ..-------
30. Buoyancy calculations for tank/pump chamber /'
31. Engineer to inspect and certify soils: wall: commercial:
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature --------'
33.H-20 loading is subject to vehicular traffic, groundwater ..-----
34. Title V Application and permit fee, installer signature ,®---
35.Foundation footing min. 2 feet above adjusted ground water for new house
36. Deed Restriction required max. #bedrooms: max. flow: gpd -----
37.
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: 6.- 1
6/03/03