HomeMy WebLinkAboutEngineer Certification Letter Engineering Works, Inc.
Civil Engineers-Surveyors-SoilEvaluators
12 West Crossfield Road,Forestdale,MA 02644 (508)477-5313
May 2, 2019
Mr. Bruce Murhy, Yarmouth Health Director
1146 Route 28
Yarmouth, MA 02664
Re: Certificate of Substantial Compliance
46 Highbank Road
Map ID: 70-71
Dear Mr. Murphy,
As per your request and in accordance with 310 CMR 15.021(3) of the State
Environmental Code-Title 5, an as-built review of the septic system at the subject site
has been conducted. I hereby certify that the septic system proposed for the property,
has been installed in substantial compliance with the Design Plan by Engineering
Works, Inc., dated 6/4/18. A new H-10 1500 gallon septic tank, H-20 distribution box
and 2-500 H-20 gallon precast chambers surrounded with 4 ft. of 3/4"-1 1/2" stone have
been installed. Soil absorption system has been vented.
Should you have any questions, please do not hesitate to call.
incerely,
Peter McEntee P.E.
MAY 032019
HEALTH DEPT.