Loading...
HomeMy WebLinkAboutEngineer Certification Letter • iT tel.(508)362-4541 .939 main street rt 6a fax(508)362-9880 yarmouth port mass 02675 down cape engineering civil engineers& land surveyors structural design Arne H.Ojala P.E.,P.LS. Timothy H.Covell,P.LS. land court David C.Thulin,P.E. surveys N 0 V 0 5 1998 November 2, 1998 site planning Bruce Murphy, R.3. , CHO sewage system Yarmouth Board of Health designs 1146 Route 28 So. Yarmouth, Mei 02664 inspections 446• L .: Port permits Dear Bruce: On 10/29/98, Down Cape Engineering, Inc. performed an inspection of the removal of unsuitable soils at the above-referenced location as required. Due to the proximity of the hedge on the easterly property line, the 5' removal as called for on the plan was not I performed completely. Since the design of the leach v facility is based on bottom area only, it is felt that the • full 5' removal is not critical to the functioning of the leach facility. This is to certify that the soils removal was performed in substantial compliance with the approved plan. If you have any questions, please do not hesitate to call me. Yours truly, Arne H. Ojala, PE, PLS Down Cape Engineering, Inc. cc: Mary Frances Baker