Loading...
HomeMy WebLinkAboutReview Checklist �j ,1_06/2 -W // TOWN OF YARMOUTH • SEWAGE PLAN REVIEW CHECKLIST �� Location: A.M. //4-;-- Lot �9 Zone of Contribution: In-Out_ Acreage %0" Commercial: Residential: �:....--' Street: `� �/G , /, //A. / .5-- / Village: CC----------- / Floor Plan: C #Bedrooms: //3/- Owner: / A /,46.x/ Installer: &--- Sr Address: Phone: Y 111P2M121r4W Phone: G /feed , /# ' i Builder: Engineer: �__ / e Address: /7Phone: cj(•:r- ' -""<' -2 i it Phone: .' _ _ns y /� /1 fi17' Ql N/A/ YES NO 1.Required#of copies received 2. Date of soils exam and percolation test not older than 2 years t.------ 3.4-5 /3.4-5 ft of naturally occurring pervious material, above water table t....----- 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: 6.Benchmark indicated and shown-NGVD if near wetlands c.,�✓' 7. Septic tank minimum 10 ft from foundation, deck Var.: L....---- 8. 18.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: t , --•-• _ 9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: •-.-- 11.Tank/leaching minimum 10 ft from property line Var.: L..----- 12. � 12. System meets all other setback requirements Var.: 13.Uses adjustment for maximum high groundwater Var.: 1 ' �� 14.Leaching set 4-5 ft above adj. water or bottom o le Var.: 0,,. �1���; 15. System not in top or subsoil(A,B horizons)or ' removal (------ 16. /16.Proposed contours are suitable 4------ 17. System meets slope requirements-min. 1/8", 1/4"preferred ��/ all: L--•-- 18. System meets breakout requirements PVC liners 5 4 (------- 19. Specified tee sizes are proper, gas baffle on outlet tee t----' 20. Sewage is under 10,000 gpd for parcel t/ 21.No garbage disposal L.----- 22. /22. System adequately sized for its intended use (...------- 23.Minimum 6"stone or compacted below tank and dbox L.-----' • 24.Manhole covers within 6"of grade,pump chamber cover to grade Lam' 25. Inspection port on plastic chambers/leach field [_,------•-• 26. Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed t.....---- 29.Vent provided if leaching below 3 feet, under driveway/parking L_.- 30.Buoyancy calculations for tank/pump chamber (---- 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ®- 33. H-20 loading is subject to vehicular traffic, groundwater 34. Title V Application and permit fee, installer signature - �-----" 35.Foundation footing min. 2 feet above adjusted ground water for new house •36. Deed Restriction required max. #bedrooms: max. flow: gpd _37. Check area lots for groundwater/Label groundwater in Assessor's Map /" Plan reviewed by: 6/03/03