Loading...
HomeMy WebLinkAboutSite Plans/ 6 / / 5 oE/ SECTION 2-B TRANSVERSE SECTION THROUGH INDUSTRIAL WASTEWATER HOLDING TANK MP. FOR 21 NOT TO SCALE JUNCTION INCH NOT A TANK 2 .Ie VC U GENERAL fiTANK I e' �aK iIF DIk Mi MC FEE ES SRS) SOMEONE FAITEDDINnt ON ATICE MALL TONAVE SIERNTSUSY 00 MR 2 — Pom rt mu OF 0151110 FACTING 13- HOUNTER 6gg -W�`NV ttNEROF ascu Se,�K „ A ,E;NA� DDNF�RT /' n n c � m OMI m. n \A� I m s z m iui�x NO cmc[�nAR E NR noxl�l, a ® s e s e o \ URE A• `� C OF_ WAIII rSMAm: DENTUF t xArzx SEwc[ K z+wmm HOUR / OFFICE ICE O lY/LLOW S]REET SITE. PIAN swe 1`3D 6 t6' -V F B - Be DO, COVERS OI f SO If to' -B' I C _J PLCO VIEW B ST500-9%Tfi PRECAST SEPTIC TANK -5.000 GALLONS . SCALE: 1/6'=1• EL 09.5' D REOPEN BOUND EL. 405' WATER 106 TEST HOLE LOG TEST BY: WELLER k ASSOC, WBNESR E HUTCHNSON DATE: MARCH 1.1991 V >lal W NOTES: k 1. LOCATIONS, SAES, SLOPES, MEVATIoxs, DISTANCES. PROFILES, DETAILS, AND T) ALL OTHER INFORMATION PRESENTED ON THIS BRINGING WAR SUPPLIED To GM LJ Y GEOENVIRONMETUAL, INC. BY COMMONWEALTH ELECTRIC COMPANY, NO INDEPENDENT n SURVENS, MISA UREMFHR, INVESTIGATION, SAMPLING. ANALYSES, OR FILE REVIEW z V q AWNTLES WERE PERFORMED BY GA GEOENVIRONMENTAI. INC. IN CONJUNCTION a QH WITH PREPARATION OF THIS DRAWING. � 2. CONCRETE - 5,000 PSI. O 20 DAYS. C7 3. STEM REINFORCEMENT PER AS.T.M. A-615-75. 2C MOW COVER FLOOR 50100' 0 4. DESIGN LOADING - STANDARD - A.A.S.H.O. HS10-66. DESIGN LOADING - OPTIONAL UNRS - A.A.S.H.O. H520-44. F d' J RN MEMS THRJ ROOF N� INDEPENDENTLY _ 5. JOINS SGLED WT H V DIA BUM RUBBER OR EOUAL a I aw 6. TE£5 - PROVIDED AND INSTALLED BY OTHERS, WROUGHT IRON STEPS N V 7. PRIOR TO BACKFIWNG, BOTH TANKS M BE TESTED FOR WATER-TIGHIMESS. Z A' FM FLUOR DRAINS EO NV OR 61.00' C TO TANKS S. HOLDING TANKS TO BE WATTERPROOFED WITH ASPHALT CONFORMING TO ASTM D449 WATER 2 INJ GR 46A2 ME A TO A THICKNESS OF 6 MIL WHEN DRY. DINE /'. 9. DESIGN ENGINEER TO INSPECT k CERTIFY INSTALLATION. 10. LEAD DETECTON SYSTEM DESCRIPTION: THE VEEDER-ROUT SYSTEM IS CURRENTLY IN PLACE TO DETECT LEAKS IN UNDERGROUND INDUSTRIAL WASIEWATER HOLDING TANKS '., AT WE STIE. ON 2/15/95 THE SYSTEM WAS UPDATED TO INCLUDE N EACH TANK A STAINLESS STEEL MAGNEIORESNDCTIVE PROBE, CAPABLE OF DETECTING LEAKS BACK A SET PERIOD OF TIME SPECIFICALLY. BY IMPOSING A 6 HOUR "RESTING" TIME (LP. NO FLUW IN OR OUT) EACH MONTH ON THE TANKS, THE SYSTEM WILL COMPENSATE FOR TEMPERATURE AND PROPOSE INDICATION OF ANY LEAKS IN THE ISR NOTE: TANKS. THE PROBES, WHICH MEASURE ACCURATELY TO 0.1 GALLON PER HOUR, WILL e� 6 BRICK PORTLAND PHASIERED ON INSIDE WITH CEMENT MORTAR - 1 PART BE INSPECTED MONTHLY FOR SIGNS OF CORROSION AND WEAR. SPARE PROBES ARE KEPI ON SRE AS REPIACEMENR. N TL CEMENT, 2 PARS SAND m 2'T REFERENCES: BE. RECORD OWNER: NEW RESPOND GAS-EDISON 61 42' �6 MPP 63 PARCEL 31 PC aooB zoxe e• ROOD ZONE 00 O W IT M puki OF EMSTING "MDC" TRAP JUT 3 z $GCE=1• IN LOTW FROMEA IF OATEM.OE MORE 51 FX EL MOO D W FRO (h Q OUT JUNCTION NO) MDC LL O 4688 TRAP ➢LL L TANK -1 TANK -2 I,. WATER IF - 68 --10" 60'-10' ]4fT SECTION A -A SYSTEM PROFILE SCALE: P=10' 6 t6' -V F B - Be DO, COVERS OI f SO If to' -B' I C _J PLCO VIEW B ST500-9%Tfi PRECAST SEPTIC TANK -5.000 GALLONS . SCALE: 1/6'=1• EL 09.5' D REOPEN BOUND EL. 405' WATER 106 TEST HOLE LOG TEST BY: WELLER k ASSOC, WBNESR E HUTCHNSON DATE: MARCH 1.1991 PROJECT NO. 13855 •'�x6r �. FIGURE NO. IL I DRAWING L tg R a TO THE NOUSTRW. NO A ry r as PRESENTm ON E#SONG OIXE0.5 aNU PRESENTED TO MAL, NG BY COMMONWEALTH CIRIC �CtlMPANY. ANO MODIFIED AS REOUIREO BY COM NWFALTH EBEGUN COMPANY. V >lal W k Ld PROJECT NO. 13855 •'�x6r �. FIGURE NO. IL I DRAWING L tg R a TO THE NOUSTRW. NO A ry r as PRESENTm ON E#SONG OIXE0.5 aNU PRESENTED TO MAL, NG BY COMMONWEALTH CIRIC �CtlMPANY. ANO MODIFIED AS REOUIREO BY COM NWFALTH EBEGUN COMPANY. V W k Ld T) Ld LJ Y n z V q a QH m � 00 C7 0 F d' J O N� 00 a aw � N V < Z EO 1--I /'. N TL 0 m BE. PC OF 00 O W IT M Z JUT 3 z LOTW FX D W W (h Q OF O LL O O PROJECT NO. 13855 •'�x6r �. FIGURE NO. IL I DRAWING L tg R a TO THE NOUSTRW. NO A ry r as PRESENTm ON E#SONG OIXE0.5 aNU PRESENTED TO MAL, NG BY COMMONWEALTH CIRIC �CtlMPANY. ANO MODIFIED AS REOUIREO BY COM NWFALTH EBEGUN COMPANY. W Ld T) Ld LJ Y z V Q a QH � 00 C7 d' J N� 00 a � 0 Z 1--I PROJECT NO. 13855 •'�x6r �. FIGURE NO. IL I DRAWING L tg R a TO THE NOUSTRW. NO A ry r as PRESENTm ON E#SONG OIXE0.5 aNU PRESENTED TO MAL, NG BY COMMONWEALTH CIRIC �CtlMPANY. ANO MODIFIED AS REOUIREO BY COM NWFALTH EBEGUN COMPANY.