HomeMy WebLinkAboutSite Plans/
6 / /
5 oE/
SECTION 2-B
TRANSVERSE SECTION THROUGH INDUSTRIAL
WASTEWATER HOLDING TANK MP. FOR 21
NOT TO SCALE
JUNCTION
INCH NOT
A
TANK 2
.Ie VC U GENERAL
fiTANK I
e' �aK
iIF DIk Mi
MC FEE ES SRS) SOMEONE FAITEDDINnt
ON ATICE MALL TONAVE
SIERNTSUSY 00
MR 2 —
Pom rt mu
OF 0151110 FACTING
13- HOUNTER
6gg -W�`NV ttNEROF
ascu
Se,�K „ A ,E;NA� DDNF�RT /' n
n
c � m
OMI
m. n
\A� I m
s z m
iui�x
NO
cmc[�nAR
E NR
noxl�l, a ® s e s e o \
URE
A• `� C OF_ WAIII rSMAm:
DENTUF
t xArzx SEwc[
K z+wmm HOUR
/
OFFICE ICE
O
lY/LLOW S]REET
SITE. PIAN
swe 1`3D
6 t6' -V F
B
-
Be DO,
COVERS
OI
f SO If to' -B'
I
C
_J
PLCO VIEW B
ST500-9%Tfi
PRECAST SEPTIC TANK -5.000 GALLONS
. SCALE: 1/6'=1•
EL 09.5' D
REOPEN
BOUND
EL. 405' WATER 106
TEST HOLE LOG
TEST BY: WELLER k ASSOC,
WBNESR E HUTCHNSON
DATE: MARCH 1.1991
V
>lal
W
NOTES:
k
1. LOCATIONS, SAES, SLOPES, MEVATIoxs, DISTANCES. PROFILES, DETAILS, AND
T)
ALL OTHER INFORMATION PRESENTED ON THIS BRINGING WAR SUPPLIED To GM
LJ
Y
GEOENVIRONMETUAL, INC. BY COMMONWEALTH ELECTRIC COMPANY, NO INDEPENDENT
n
SURVENS, MISA UREMFHR, INVESTIGATION, SAMPLING. ANALYSES, OR FILE REVIEW
z
V
q
AWNTLES WERE PERFORMED BY GA GEOENVIRONMENTAI. INC. IN CONJUNCTION
a
QH
WITH PREPARATION OF THIS DRAWING.
�
2. CONCRETE - 5,000 PSI. O 20 DAYS.
C7
3. STEM REINFORCEMENT PER AS.T.M. A-615-75.
2C MOW
COVER FLOOR
50100'
0
4. DESIGN LOADING - STANDARD - A.A.S.H.O. HS10-66.
DESIGN LOADING - OPTIONAL UNRS - A.A.S.H.O. H520-44.
F
d'
J
RN MEMS THRJ ROOF
N�
INDEPENDENTLY _
5. JOINS SGLED WT H V DIA BUM RUBBER OR EOUAL
a
I
aw
6. TE£5 - PROVIDED AND INSTALLED BY OTHERS,
WROUGHT IRON STEPS
N
V
7. PRIOR TO BACKFIWNG, BOTH TANKS M BE TESTED FOR WATER-TIGHIMESS.
Z
A' FM FLUOR DRAINS
EO
NV OR 61.00'
C TO TANKS
S. HOLDING TANKS TO BE WATTERPROOFED WITH ASPHALT CONFORMING TO ASTM D449
WATER 2
INJ GR 46A2
ME A TO A THICKNESS OF 6 MIL WHEN DRY.
DINE
/'.
9. DESIGN ENGINEER TO INSPECT k CERTIFY INSTALLATION.
10. LEAD DETECTON SYSTEM DESCRIPTION: THE VEEDER-ROUT SYSTEM IS CURRENTLY IN
PLACE TO DETECT LEAKS IN UNDERGROUND INDUSTRIAL WASIEWATER HOLDING TANKS
'.,
AT WE STIE. ON 2/15/95 THE SYSTEM WAS UPDATED TO INCLUDE N EACH TANK A
STAINLESS STEEL MAGNEIORESNDCTIVE PROBE, CAPABLE OF DETECTING LEAKS BACK
A SET PERIOD OF TIME SPECIFICALLY. BY IMPOSING A 6 HOUR "RESTING" TIME
(LP. NO FLUW IN OR OUT) EACH MONTH ON THE TANKS, THE SYSTEM WILL
COMPENSATE FOR TEMPERATURE AND PROPOSE INDICATION OF ANY LEAKS IN THE
ISR
NOTE:
TANKS. THE PROBES, WHICH MEASURE ACCURATELY TO 0.1 GALLON PER HOUR, WILL
e�
6 BRICK
PORTLAND
PHASIERED ON INSIDE WITH
CEMENT MORTAR - 1 PART
BE INSPECTED MONTHLY FOR SIGNS OF CORROSION AND WEAR. SPARE PROBES ARE
KEPI ON SRE AS REPIACEMENR.
N
TL
CEMENT, 2
PARS SAND
m
2'T
REFERENCES:
BE.
RECORD OWNER: NEW RESPOND GAS-EDISON
61 42'
�6
MPP 63 PARCEL 31
PC
aooB zoxe e•
ROOD ZONE
00
O
W
IT
M
puki
OF EMSTING "MDC"
TRAP
JUT
3
z
$GCE=1•
IN
LOTW
FROMEA IF OATEM.OE
MORE 51
FX
EL MOO
D
W
FRO
(h
Q
OUT JUNCTION NO)
MDC
LL
O
4688
TRAP
➢LL L
TANK -1 TANK -2
I,.
WATER IF -
68 --10" 60'-10'
]4fT
SECTION A -A
SYSTEM PROFILE
SCALE: P=10'
6 t6' -V F
B
-
Be DO,
COVERS
OI
f SO If to' -B'
I
C
_J
PLCO VIEW B
ST500-9%Tfi
PRECAST SEPTIC TANK -5.000 GALLONS
. SCALE: 1/6'=1•
EL 09.5' D
REOPEN
BOUND
EL. 405' WATER 106
TEST HOLE LOG
TEST BY: WELLER k ASSOC,
WBNESR E HUTCHNSON
DATE: MARCH 1.1991
PROJECT NO.
13855
•'�x6r �. FIGURE NO.
IL I
DRAWING L tg R a TO THE
NOUSTRW. NO A ry r as PRESENTm
ON E#SONG OIXE0.5 aNU
PRESENTED TO MAL, NG BY
COMMONWEALTH CIRIC �CtlMPANY. ANO MODIFIED AS
REOUIREO BY COM NWFALTH EBEGUN COMPANY.
V
>lal
W
k
Ld
PROJECT NO.
13855
•'�x6r �. FIGURE NO.
IL I
DRAWING L tg R a TO THE
NOUSTRW. NO A ry r as PRESENTm
ON E#SONG OIXE0.5 aNU
PRESENTED TO MAL, NG BY
COMMONWEALTH CIRIC �CtlMPANY. ANO MODIFIED AS
REOUIREO BY COM NWFALTH EBEGUN COMPANY.
V
W
k
Ld
T)
Ld
LJ
Y
n
z
V
q
a
QH
m
�
00
C7
0
F
d'
J
O
N�
00
a
aw
�
N
V
<
Z
EO
1--I
/'.
N
TL
0
m
BE.
PC
OF
00
O
W
IT
M
Z
JUT
3
z
LOTW
FX
D
W
W
(h
Q
OF
O
LL
O
O
PROJECT NO.
13855
•'�x6r �. FIGURE NO.
IL I
DRAWING L tg R a TO THE
NOUSTRW. NO A ry r as PRESENTm
ON E#SONG OIXE0.5 aNU
PRESENTED TO MAL, NG BY
COMMONWEALTH CIRIC �CtlMPANY. ANO MODIFIED AS
REOUIREO BY COM NWFALTH EBEGUN COMPANY.
W
Ld
T)
Ld
LJ
Y
z
V
Q
a
QH
�
00
C7
d'
J
N�
00
a
�
0
Z
1--I
PROJECT NO.
13855
•'�x6r �. FIGURE NO.
IL I
DRAWING L tg R a TO THE
NOUSTRW. NO A ry r as PRESENTm
ON E#SONG OIXE0.5 aNU
PRESENTED TO MAL, NG BY
COMMONWEALTH CIRIC �CtlMPANY. ANO MODIFIED AS
REOUIREO BY COM NWFALTH EBEGUN COMPANY.