Hi Kelly,
I received the email below from Sarah Ojala with your additional conditions for the steps at 82 driftwood lane. I have
attached two photos of a job we did where we transversed a mossy slope with an excavator and a link to a small air
hammer that I have. https://rhinotool.com/product/pd-200/
I believe we will do less damage to the bank using these tools than if we were to go in with post hole driggers and
shovels. On the job in the photos there was more damage done walking back and forth than done with the excavator. If
this works on 82 Driftwood there would be no need for the jute or seed as there would be no disturbance. There is a
chance we could have rock issues that may change that in some areas. May we have your permission to use this
method?
thth
We also need to have a pre-construction meeting would you be available the 16 or 17 to do that?
Many thanks
Skipper Lee
rpl@cros.us
~~~_/) ~~~
Cross Rip Ocean Services LLC
2 Birch Drive
Harwich, MA 02645
USA
508-878-6658
www.crossripoceanservices.com
The information contained in this electronic message and any attachments to this message are intended for the
exclusive use of the individual or entity to which it is addressed, and may contain information that is privileged,
confidential and exempt from disclosure under applicable law. If the reader of this electronic message is not the
intended recipient, or the employee or agent responsible for delivering the electronic message to the intended
recipient, you are hereby notified that any dissemination, distribution, printing or copying of this
communication is strictly prohibited.
From: Sarah Ojala - Down Cape Engineering, Inc. \[mailto:sojala@downcape.com\]
Sent: Wednesday, May 08, 2019 3:05 PM
To: 'robert mcnamara'
1
Cc: 'rpl'; Priscilla@downcape.com; Heather DCE
Subject: FW: 82 Driftwood Lane Dock Plan
Hi,
Just received this email….she has approved the latest plan with these extra conditions.
I forwarded the General License Certification application packet to the state today.
Regards,
Sarah
From: Daniel A. Ojala PE, PLS <downcape@downcape.com>
Sent: Wednesday, May 8, 2019 3:00 PM
To: Sarah B. Ojala <sojala@downcape.com>
Cc: 'Craig J. Ferrari, EIT' <craig@downcape.com>; dgonsalves@downcape.com; 'James A. Nordstrom'
<james@downcape.com>
Subject: FW: 82 Driftwood Lane Dock Plan
From: Grant, Kelly \[mailto:KGrant@yarmouth.ma.us\]
Sent: Tuesday, May 07, 2019 12:17 PM
To: 'Daniel A. Ojala' <downcape@downcape.com>
Subject: 82 Driftwood Lane Dock Plan
Hi Dan
I have reviewed the revised plan for this property.
I have the following comments/conditions in addition to those in the Order:
1. There should be no vegetation removal for construction. The vegetation at the bottom of the bank can be
minimally pruned to allow access.
2. Work on the bank shall be by hand. Sections of the stairway should be constructed off site/above bank and
installed to minimize disturbance.
3. The work limit line shall be limited to 2 feet either side of the footprint.
4. Immediately following construction, areas of the bank in the location of the old stairway shall be stabilized using
jute matting and native grass seed. Same applies to areas disturbed during construction.
Plan is approved and will be added to the file. Can you please send me an electronic copy.
Thanks
Kelly Grant
Conservation Administrator
Town of Yarmouth
508-398-2231 Ext 1288
kgrant@yarmouth.ma.us
To help
protect your
privacy,
Virus-free. www.avast.com
Microsoft
Office
prevented
2
3