PARCEL: L E LOGS 1) The installation shall comply with the State Environmental Code Title V and Town of
Board of Health Regulations.
FLOOD ZONE:��- SOIL EVALUATOR: � � C��
^} 2) The septic system as proposed on this plan shall not be installed until a licensed town installer
_ - WITNESS : X�j llD
REFERENCE: receives approval and an installation permit from the applicable town.
DATE: �p J
- --"3) Prior to installation, the installer shall verify the location of utilities, sewer inverts, sewer lines
�� PERCOLATION ATE : and existing septic components prior to installation.
/Z 1, CWt 1 4) All gravity sewer piping is to be 4 inch schedule 40 PVC at 1/8"
per foot. The first 2 feet out of
1. k
g Jd %78 TH- ITH-2 the distribution box shall be level. All piping connections to be glued.
I it- 5) This septic design plan is not to be utilized for pro ert lined t
7-
1001
)�q' vw-
IJ
��iyUK T77 --A
NF
�01
L p y e ermination or for any other
[Oki =J purpose other than the proposed septic system installation.
LOAVAV
3d `V �\7)
6) All Title V components are to meet Title V specifications.
10 Parking shall be prohibited over Title V components unless components are H2O loaded.
%8) The existing leaching or cesspools shall be pumped and filled with
p p material per Title V
abandonment procedures. Leaching and cesspool(s) and contaminated soils within the
10
,� D proposed SAS shall be removed and replaced with clean sand per Title V specifications.
�p 9) Septic components are to be 10 from a water service line. Sewer lines crossing a water line shall
��� ►�{ �D ebb be sleeved with an appropriately sized schedule 40 PVC with ends grouted. The water service
line or the septic line
��y�� \ P can be sleeved with the sleeve being a distance of 10 on both sides of
_
%V crossing the line.
'i tJ �A 10) If a garbage grinder exists in the structure, it is to be removed if the septic system is not
designed to accommodate a garbage grinder.
SEPTIC SYSTEM E S I G N 11) The installer is responsible for care of excavation around all utilities on the property and
protecting the structural integrity of all structures during the installation process of the septic
system.
FLOW ESTIMATE 12) This plan only represents that a septic system can be installed on the property meeting Title V
requirements.
BEDROOMS ATHQ IQ GAL/DAY/BEDROOM - GAL/DAY 13) The property owner shall review design criteria to approve the total number of bedrooms and
SEPTIC TANK design flow. Installation of the septic system as proposed and receipt of payment for the design
shall be deemed approval of the design criteria by the property owner or agent of.
3W.GAL/DAY x 2 DAYS • l L GAL 14) The validity of this plan shall expire with the expiration of the town installation permit issued for
USE 1.000I this plan or the validity of this plan shall expire on the expiration of the Certificate of Compliance
:�►l�
issued for the installation of the proposed system on this plan.
��GALLON 'SEPTIC TANK .
tTL_PDX-1tE#SZiRP
U (!� ► c is tWr ,L'T -�tr+�� e.�Iv. � t)
SEPTIC SYSTEM SECTION
M KK
10 I� �
W
GAL
SEPTIC TANK
Yrrmout 111le-nlA?a Dey rtnent
DATE
]Dat-.
HEALTH AGENT
lvj_�f%�IJOV4 LF
UN
I �qq''
A CD
-- I l,zG �, z S' �
cro V4