Loading...
HomeMy WebLinkAboutReview Checklist / TOWN OF YARMOUTH �1 SEWAGE PLAN REVIEW CHECKLIST ‘ Location: A.M. t6 Lot 0Zone of Contribution: In''� Out_ Acreage a,. J- fl-e-*f, s. Commercial: Residential: t__..-- Street: 14 � ., //f-/ Village: Floor Plan: #Bedrooms: 1" Owner: 7 Installer: .10( Address: Phone: 5-'0 " 7 q...rin4 '~ 3 Phone: Builder: Engineer: )040e,a/ /' lal Address: Phone: .'.'.3(7--7.(/*, 'J .616..,& Phone: -- �' G/rrri/ir_ / �✓f5 , V N/A YES NO 1.Required#of copies received 2. Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material, above water table Lam' _ 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: c...-------- 5. .�'5. Water line 10 ft from septic components Var.: Vis/ 6.Benchmark indicated and shown-NGVD if near wetlands Ls 7. Septic tank minimum 10 ft from foundation, deck Var.: `.---- 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 4....------ 9. �/9. Leaching minimum 100 ft from wetlands Var.: %........- 10. 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: .---- 11. Tank/leaching minimum 10 ft from property line Var.: L.-----. 12. System meets all other setback requirements Var.: 13.Uses adjustment for maximum high groundwater Var.: - v f- c-kez..J1/1 , 11 14. Leaching set 4-5 ft above adj.water or bottom of test hole Var.: 0- 1- ��_ (...--- 15. ..®15. System not in top or subsoil(A,B horizons) or 5' removal l___.---- 16. ei16.Proposed contours are suitable L1> 17. System meets slope requirements-min. 1/8", 1/4"preferred C....--- 18. i18. System meets breakout requirements PVC liner: Wall: L..--• 19. Specified tee sizes are proper, gas baffle on outlet tee c.o-.. 20. Sewage is under 10,000 gpd for parcel %.,.es' 21.No garbage disposal l.../. 22. System adequately sized for its intended use L.r- 23.Minimum 6"stone or compacted below tank and dbox mss► 24.Manhole covers within 6"of grade,pump chamber cover to grade ‘....--- 25. Inspection port on plastic chambers/leach field L.-- 26. Electrical permit for pump chamber/Separate meter for duplexes �27.Pump system-2" line,weep hole,check valve,tee in dbox, pump size \- ✓ 28. Septic tank/pump chamber to be factory waterproofed 29.Vent provided if leaching below 3 feet, under driveway/parking '4...--' 30. Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: wall: commerc l:c, • � 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature L 33.H-20 loading is subject to vehicular traffic, groundwater 34.Title V Application and permit fee, installer signature - •.....---- 35. se35.Foundation footing min. 2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpd �.--- _ 37.Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: 6/03/03