Loading...
HomeMy WebLinkAboutReview Checklist ci �- '/2.,.. TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 7 _4)______ _�- 7 Lot Zone of Contribution: In Out Acreage 7 /� /� Commerci, • Residential: L......."Street: / Village: l' Floor Pl. : • Bedrooms: .2 = 1 Pr Owner: ,-'444c4.4 AO4t4 G'' Installer: - ,Gl. S C i---.4.4. - Address: Phone: i pi - - ..-- �= ►i� Phone: -'I' Builder: / . Engineer: .17/4.Q Address: Phone: 9i, - t"'- 7 Phone: (i,., , fC, l �r , / j 1.Required# of copies received i---- 2.Date of soils exam and percolation test not older than 2 years L______,- 3.4-5 ft of naturally occurring pervious material, above water table L.---- 4. -_4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: --- 5. Water line 10 ft from septic components Var.: L--- 6.Benchmark indicated and shown-NGVD if near wetlands t..____-- 7. Septic tank minimum 10 ft from foundation, deck Var.: �.,-- 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: i 9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: ' „_,.- 13.Uses adjustment for maximum high groundwater Var.: i._....--- 14. Leaching set 4-5 ft above adj.water or bottom o st hole Var.: ___-- 15. System not in top or subsoil(A,B horizons) r 5'remov (...____--- 16. �__---16.Proposed contours are suitable __-- t.------- 17. -----``17. System meets slope requirements-min. 1/8", 'A"preferred 18. System meets breakout requirements PVC liner: Wall: -- ~" 19. Specified tee sizes are proper, gas baffle on outlet tee C.-- _ _ 20. Sewage is under 10,000 gpd for parcel L.--- 21.No garbage disposal 22. System adequately sized for its intended use L.------ :23. -,,-.r23.Minimum 6"stone or compacted below tank and dbox ' 24.Manhole covers within 6"of grade,pump chamber cover to grade (...---- 25.Inspection port on plastic chambers/leach field t______ 26. Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2" line,weep hole,check valve,tee in dbox, pump size L,- 28. Septic tank/pump chamber to be factory waterproofed 1--------- 29. /29. Vent provided if leaching below 3 feet, under driveway/parking 30.Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature . 33.H-20 loading is subject to vehicular traffic, groundwater 34. Title V Application and permit fee, installer signature 35.Foundation footing min. 2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd T 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: &) 6/03/03