HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
- SEWAGE PLAN-REVIEW CHECKLIST
E Location: A.M. /0/ Lot Zone of Contribution: In • Out_ Acreage " . 2 .
Commercial: Residential:
Street: q-g pt, 4/5 /7"/
Village: ` Floor Plan: C. #Bedrooms:_
Owner: A.elege,/‘Kgier,1/- Installer:
Address: Phone: '
Phone: I LL D. /
Builder: 7 /
Engineer: i ` i
Address: Phone: P' _3- _ 5:1Phone:
>...)
N/A YES NO
1.Required# of copies received ‘.....----
2. Date of soils exam and percolation test not older than 2 years t....
3. 4-5 ft of naturally occurring pervious material, above water table
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 1/4......--
5. Water line 10 ft from septic components Var.: C-----•
6. Benchmark indicated and shown-NGVD if near wetlands ...._.....-
7.
�7. Septic tank minimum 10 ft from foundation, deck Var.: t.....---'
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: l.......--
9. Leaching minimum 100 ft from wetlands Var.: c..-------
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ‘.---
11. Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.:
13. Uses adjustment for maximum high groundwater Var.: y7.--
14. Leaching set 4-5 ft above adj.water or bottom o - o Var.: L/
15. System not in top or subsoil(A,B horizons) o 5'remova . pie1 Otice , L----"*.a4 L
16.Proposed contours are suitable k...------
17.
�17. System meets slope requirements-min. 1/8", ' "preferred �.----
18. System meets breakout requirements PVC liner: ' all: �---•
19. Specified tee sizes are proper, gas baffle on outlet tee Lam'
20. Sewage is under 10,000 gpd for parcel Com•
21.No garbage disposal ®-
? 22. System adequately sized for its intended use (...®
1 23. Minimum 6"stone or compacted below tank and dbox <.---
24.Manhole covers within 6"of grade,pump chamber cover to grade <......--
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexes ,_----•
27.Pump system-2"line,weep hole,check valve,tee in dbox, pump size �----•
28. Septic tank/pump chamber to be factory waterproofed s.----
29. Vent provided if leaching below 3 feet, under driveway/parking ®►
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial: ..-----.
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33. H-20 loading is subject to vehicular traffic, groundwater
34.Title V Application and permit fee, installer signature - C �--1")
35.Foundation footing min. 2 feet above adjusted ground water for new house --
36. Deed Restriction required max. #bedrooms: max. flow: gpd
37. Check area lots for groundwater/Label groundwater in Assessor's Ma < ��
Plan reviewed by: 6/03/03