May 24, 2019
Kelly Grant, Conservation Administrator
Conservation Commission
Town of Yarmouth
1146 Route 28
South Yarmouth, MA 02664
Regards: Request for Certificate of Compliance
Daniel A. Ojala, P.E., P.L.S.
Arne H. Ojala, P.E., P.L.S.
Daniel E. Gonsalves, P.E., S.E.
Craig J. Ferrari, E.I.T., S.E.
Mass DEP file #SE83-2149; site: 151 Route 28, West Yarmouth
Dear Commission Members and Administrator Kelly Grant:
On March 6, 2018, the Commission issued an Order of Conditions for the installation
of a septic system at 151 Route 28, West Yarmouth.
A site visit was made on May 23, 2019, for the purpose of closing out the Order of
Conditions. A Septic As-Built Plan, revised May 24, 2019, is enclosed. A dumpster
pad was added by the owner as shown on the as built plan. The drainage pit proposed
was found to have been constructed per the previous upgrade plan.
This letter is to ce1tify, to the best of my knowledge and belief, the work was
perfo1med in substantial compliance with the approved plans and Order of
Conditions. We hereby request the issuance of the Certificate of Compliance at this
time.
Thank you for your consideration.
Sincerely,
Daniel A. Ojala, PE, PLS
Down Cape Engineering, Inc.