Loading...
HomeMy WebLinkAboutEngineered Plan - Rev. 1996CONCRETE ,..;. . ANCHOR MAX. r - 4" CAST IRON PIPE t n -(OR EQUAL) MINIMUM " .._. PITCH 1/4" PER FT. LEVEL 0 ELEV = 6" SUMP ELEV = 1,7'y'•'r , -- :_'--;-= ELEV FLOW LINE r/A)SF/4)1-_,4 :70r.� W11'a S?.�,� >=LEV 9 7, t, 100DISTRIBUTION ELEV _ MIN. 190 l0 7,'; / ",j .J a 3/8" DRILL Z ELEV. = �,2.- --, HOLE TO BE WATER TESTED Y qb `'r, TRENCH FORMATION WELL M�`'f ELEV._ �,5�ZONEoIF MORE THAN ONE OUTLET OIL ABSORPTION INDEX CHECK VALVE 3/4" TO 1 1/2 -ADJUST (TO BE PLACED ON FIRM BASE) WASHED STONE DEPTH BENCHMARK TEXTURE 4" SCHEDULE 40 PVC PIPE MOTT. SOIL TEST ' TOP; OF `SAAB.''-` IDye 20 FT. MINIMUM MIN. PITCH 1/8" PER FT. CLEAN SAND :L" LAYER OF DATE OF SOIL TEST LE - /Od U 10 FT. MINIMUM "" 2 PRESSURE PIPE TO 1/2'. s \1/8V. SOIL TEST DONE BY �6 (ASSUMED) - 150 PSI MINIMUM _ ELE; !t, Yk , �•t.MASHED STONE TcovE>Rs WITNESSED BY I< r ter. L 11 jr/1 V " 6 .� �.,�t s`1`�'-7 --------_�- PVD OBSERVATION HOLE 1 ELEV= /oc - OBSERVATION HOLE 2 ELEVCU. FT. OF PERCOLATION RATE ': 2-�~. MIN./INCH AT = j INCHES PERCOLATION RATE MIN./INCH AT INCHES CONCRETE ,..;. . ANCHOR MAX. r - 4" CAST IRON PIPE t n -(OR EQUAL) MINIMUM " .._. PITCH 1/4" PER FT. LEVEL 0 ELEV = 6" SUMP ELEV = 1,7'y'•'r , -- :_'--;-= ELEV FLOW LINE r/A)SF/4)1-_,4 :70r.� W11'a S?.�,� >=LEV 9 7, t, 100DISTRIBUTION ELEV _ MIN. 190 l0 7,'; / ",j .J a 3/8" DRILL Z ELEV. = �,2.- --, HOLE TO BE WATER TESTED Y qb `'r, TRENCH FORMATION WELL M�`'f ELEV._ �,5�ZONEoIF MORE THAN ONE OUTLET OIL ABSORPTION INDEX CHECK VALVE 3/4" TO 1 1/2 -ADJUST (TO BE PLACED ON FIRM BASE) WASHED STONE DEPTH HORIZ TEXTURE COLOR MOTT. OTHER STYEETSER ENGINEERING 235 GREAT WESTERN ROAD 508=- P. 0. BOX 713 398-3922 SOUTH DENNIS, MASS. 02660 IDye yp �6 c�z 99 I - 8 C. •w !t, Yk jr/1 1000 GALLON PUMP Yt, r BOTTOM OF TEST HOLE OR USGS PROBABLE Y'ATER TABLE ELEV = rJ' • ,' WATER ENCOUNTERED AT ELEV. _ � %' ' `� WATER ENCOUNTERED AT ELEV. _ SEPTIC TANKOBSERVED WATER TABLE ( 7 /7_� Aa > El EV. HAMBER �cl7 PUMP CHAMBER CA-.LCULATIONS: LEGEND: DESIGN CALCULATIONS ELEV. AT INVERT INLET ` ELEV AT ALARM ON _L'� �F� _ EXISTING SPOT ELEVATION 00X0 NUMBER OF BEDROOMS SEWAGE DISPOSAL SYSTEM PROFILE ECFV AT PUMP ON 2 REQUIRED FLOW PER CYCLE .25 X^� - �1 p GAL/CYCLE ,�?.i EXISTING CONTOUR ----00---- GARBAGE DISPOSAL UNIT - :, : VOLUME PER CYCLE I_l__n GAL/YCLE /7.48 GAL/CU. FT. - CU. FT./CYCLE NOT TO SCALE ELEV. AT PUMP OFF '= '' �sZ, FINAL SPOT ELEVATION 00,0 TOTAL ESTIMATED FLOW v� GAL AY BOTTOM OF INSIDE PUMP CHAMBER .2'> s ;� CU. FT. FINAL CONTOUR 00 (-�ll.� /8 { ) =, .— /D ra ` , c TOTAL MINIMUM VOLUME PER CYCLE i REQUIRED SEPTIC TANK CAPACITY BOTTOM OF OUTSIDE PUMP CHAMBER T �{ ) SOIL TEST LOCATION DISCHARGE W_._._� ICUPIFT. 3 34.67 CU.FT4 X. - � FT. 1000 G.S.TT •� t� ',� GAL c , � .� GAL R. AY X BR. I s.3 / _ a. %�D UTILITY POLE -O-GAL • STORAGE CAPACITY (��� GAL/DAY / 7.48 GAL/CU.FT. / 34.67 CU.FT./FT. = i" FT. ACTUAL SIZE OF SEPTIC TANK /� �'o �t f /^ r _ -, fir p sr n ,:� y ( ` urs SOIL CLASSIFICATION 70 R t � ✓ � � �. �� � 9 :r TOWN WATER W �—.� CATCH BASIN `®7 DESIGN PERGOLATION RATE MIN./IN. GAS LINE G '" EFFLUENT LOADING RATE GAL/DAY/S.F. _�_.-_ ACHING AREA a r SQ. FT, LY, �(t LEACHING CAPACITY (AREA X RATE) 7 GAL/DAY t' ! 60( y0,71� vim �Jt� RESERVE LEACHING CAPACITY GAL/DAY --- NOTES:o - .� / , 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. C",�V' RULES AND TITLE 5 AND THE TOWN OF YAri+aov DISPOSAL OF SEWAGE. REGULATIONS FOR `INE SUBSURFACE,ALL BE BROUGHT TO - . , _..._...,,.�---�-"'`. ��----•"." ,� ��.- - WITHIN 6 OF FINISHED GRASAN SANITARY 2. ALL COVERS TO SANITARY UNITS SH 3. ALL COMPONENTS OF THE I SYSTEM SHALL BE CAPABLE OF . WITHSTANDING H--10 LOADING UNLESS THEY 'ARE UNDER OR WITHIN Y •� 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE USED UNDER OR WITHIN 10 f?. OF DRIVES OR PARKING AREAS. 4. ANY MASONARY UNITS ,USED TO BRING 'COVER S TO .GRADE SHALL `_ _•... - . , r ! BE MORTARED IN PLACE. Pl=!N Tl - HAS lfAnr T 11LA — — r : s - 5. NO I�FTF f�►•J tJtttiGi7 �i� �0-NTNG REV`ULAitONS.:Ot�1NI:R / APPLICANT, IS TO OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. 6, UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR o IS TO CALL "DIG -SAFE" AT 1-800-322-4844 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE. - D 7. CONTRACTOR IS TO VERIFY GRADES 'AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR ,TO COMME�CING WORK ON SITE. 8: PARCEL IS IN FLOOD ZONE .LOT IS SHOWN. ON ASSESSORS MAP AS. PARCEL . s t ` • `• -- r'�" ' ` r - 10. PUMP AND ALARM ARE TO BE ON SEPERATE CIRCUITS. 11. ALARM 'S TO BE BOTH AUDIO AND UA 12. SEPTIC TANK AND PUMP CHAMBER ARE TO BE TESTEDIN INSURE THAT THERE IS NO INFILTRATION OF ' GROUNDWATER INTO FACILITIES. .,, ` ` ♦ 13. ALL UNSUITABLE MATERIAL SHALLBE REMOVED FROM UNDER AND FOR A MINIMUM OF 5' AROUND SOIL: ABSORPTION SYSTEM AND BE -i= WITH 310 CMR 15.255:(3). REPLACED MATERIAL AS IN 14. EXISTING !S TO BE PUMPED AND REMOVED.: l,iren `` " + "fr .,�j 1 . A 6K. LA 3/4""RTO DI SIB E 5 SEPTIC T UMP CHAMBER, AND. DISTRIBUTION BOX ARE TO 8E t SET ON LAYER OF 1-1 ONE. L.��a 11,,- 16. DESIGN ENGINEER IS TO INSPECT AND. CERTIFY THAT THE SEPTIC SYSTEM HAS BEEN INSTALLED IN ACCORDANCE WITH THIS PLAN. QCT AUG 11 4ISES APPROVED: BOARD OF HEALTH _�it.i - _. HEALTH DEFT. _ DATE ,AGENT c� PROPOSED PLOT PLAN FOR 1 ZCJTIG: vil PROJECT LOCATION ,..- �T '."" �r'`�f" %+ fP,j�frt°,✓*G"�I f"""�, {+'iprcMl�:'.*s! j .�� STYEETSER ENGINEERING 235 GREAT WESTERN ROAD 508=- P. 0. BOX 713 398-3922 SOUTH DENNIS, MASS. 02660