HomeMy WebLinkAboutBoard of Health Hearing - 2014A 4' VENT PIPE (CAST IRON) TO RUN
INDEPENDENTLY UP TO ROSE
HOLDING TANK CROSS SECTION — PLAN VIEW
AL
PRESSURE PORT —
MINIMUM
MANWAY/TANK ACCESS
SEE CROSS SECURE BELOW'—
(TYPICAL)
ROONNE
I'I
W
FOR COIITNUATION
TEST PORT
4' BRONZE BALL VALVE POP PRIMARY
(MIOPL)
4" BRONZE BALL VALK FOR PRIMARY
PIPING PRESSURE TEST
CONTAINMENT PIPE
PIPE FOR PIPE ENTRANCE TO
TERM LATER
HOLDING POND
CONTAINMENT PIPE
i
TERMINATION
INTERSTTAL SPACE PORT
OO
{ O
ORT (TYPICAL OF 1)
r`
ROSE GALLON UNDERGROUND
DOUBLE-WALL FIBERGLASS HOLDING
R,
TANK
A 4' VENT PIPE (CAST IRON) TO RUN
INDEPENDENTLY UP TO ROSE
HOLDING TANK CROSS SECTION — PLAN VIEW
AL
2 -
EL
VENT PIPE
PRESSURE PORT —
MINIMUM
PAL IAY/TANK ACCESS
15
(TYPICAL)
ROONNE
I'I
W
TEST PORT
4' BRONZE BALL VALVE POP PRIMARY
(MIOPL)
PIPING PRESSURE TEST
LENGTH OF STEEL OR CAST IRON
PIPE FOR PIPE ENTRANCE TO
HOLDING POND
CONTAINMENT PIPE
TERMINATION
PROPOSED TANK PRESSURE LEVY
ORT (TYPICAL OF 1)
VENT PIPE (CAST [PON) TO RUN
_4'
INDEPENDENTLY UP TO ROOF
�� et
C
FROM TRENCH DRAINS --a.
N MAINTENANCE AREA —)—
IN MAI
F�
ELECTRICAL CONDUIT TO ALARM PANE
2--t
PROPOSED SENSOR TO BE PRIED THROUGH
EXISTING ELECTRICAL CONDUIT
PENETRATON TO BE DRILLED IN SECONDARY
PIPING WITHIN SEALED SUMP TO ALLOW
POTENTIAL LEAKS IN PRIMARY PIPING TO
DRAIN VA GFANTY TO THE SUMP
5' BRONZE BALL VELMA FOR
—CLOSING VENT FOR TANK
PRESSURE TEST
PROPOSED PIPING SUMP SENSOR
OWNTEC MODEL i LS -ASC SUMP SENSOR)
TO BE PLACED IN LOWEST PORTON OF SUMP
INTERSTTAL SPACE
PORI
PUSHING TANK HIGH LEVEL SENSOR
(ELEVAUON IS APPROXIMATE)
1.000 CALLON UNDERGROUND OBUBLE-WALL
PROPOSED INTERSTTAL SPACE SENSOR j
FIBERGLASS PENDING TANK
(OPENED MODEL R VAT -4)
HOLDING TANK CROSS
SECTION —
SIDE VIEW
2 -
EL
VENT PIPE
TERMINATES
MINIMUM
OF
15
ABOVE
ROONNE
I'I
W
FROM TANK AND FROM TANK VENT
CONTAINMENT ALARMS
ALARM SYSTEM AND VENT EXIT DETAIL
PE
FLOOR
1.000 GALLON UNDERGROUND DOUBLE-WALL
FIBERGLASS HOLDING TANK
OCERRES MODEL IT SON M. 4')
HOLDING TANK CROSS SECTION — END VIEW
NOTES:
1. ADAPTED ALARM SYSTEM AND VENT EXIT DETAIL FROM RDK
ENGINEERING (DRAWING P 5.1, DETAIL 4.5, PROJECT 20140213.00)
2. ADAPTED HOLDING TANK CONNECTIONS FROM RDK ENGINEERING
(AS—BUILT DRAWING 5.0, DETAIL 1, PROJECT 2014021-3.00)
UNAUTABRODEO ALTERUBON OR PROJ. ENGINEER: GG DRAWN BY: WE
PXwECT WEE: TRE: 'mHE NO.
§ A°°m°BAS/ OF °°`°'E""E e 60 ANSEL HALLET ROAD
„aF A9A, A MDLADBN BFBT"GRE DESIGNED BY: WH/GG CHECKEDSO ® PROPOSED CONTINUOUS LEAK
LIE as T11EBEBU °"BN>s (ORGG°/Es DRAWING BAALO AS SHOWN PLOT SCALE1 T WEST YARMOUTH, MASSACHUSETTS MONITORING SYSTEM:
iPL n °E ANY zwBSSoE) PRE➢AREU 1
'� ENVIRO M BY OR GERI hl£ SOL OF DRAWING GATE: 9/2]/11 PRINT 1YPE B&W wECT Fcc
No, A9900 B,££"G/N�R s,A&L NBT BE ROUX ASSOCIATES INC. VEHICLE WASH WATER
REUSED FOR ANY EX A5ION5 OFFICE: MA PAPER SIZE: ARCH B 1 {A P
ov mE ROBUSTLY OR ANY 209 Shatter Street FEDEX EXPRESS S f'''V� ZiD oeAwwc
°]NEM PROJ£C) ENTRANT ARE PROJECT NG.: G444.DD74M000 � �E HOLDING TANK
Rwlsmx oEecAmnox 1✓RO�FDRAWING FILE FEaT0a0z.DwG CONSENT OF THE IslanEia, New York 11749 (631) 232-2600 1 OF 2
Be wTE
P.