GENERAL NOTES
1. PLAN REFERENCE: PLAN BOOK 280, PG. 16; ASSESSORS'
MAP 92, PARCELS 7 & 8
2. ELEVATIONS REFER TO DLLR'. SEE BENCHMARK ON
TOP OF CORNER STONE AT STONE REVETMENT WEST
EAS'.
3. CONSTRUCTION ACCESS SHALL BE PRIMARILY BY THE
RIVER WITH LIMITED ACCESS DIRECTLY DOWN THE
PATH TO THE WORK SITE.
4. EXCAVATION SHALL BE LIMITED TO THAT NECESSARY
FOR PILING INSTALLATION. WHERE NAVIGABLE
WATER ALLOWS, PILINGS SHALL BE HAMMER DRIVEN.
MINIMUM PILING EMBEDMENT DEPTH SHALL BE 12 FT.
5. ALL HARDWARE USED FOR CONSTRUCTION SHALL BE
OF HOT DIP GALVANIZED STEEL OR EQUAL.
6. ALL TIMBER USED SHALL BE CONSTRUCTION GRADE,
YELLOW PINE, PRESSURE - TREATED FOR MARINE USE.
THE TREATED LUMBER SHALL BE INA "DRY -
PRESERVATIVE" CONDITION WITH NO PRESERVATIVE
RESIDUE PRESENT.
7. CONSTRUCTION MATERIALS AND DEBRIS SHALL NOT
BE STORED OR DISCARDED ON THE BANK OR BEACH.
THE BUFFER ZONE SHALL BE COMPLETELY CLEARED
OF ANY DEBRIS ON A DAILY BASIS.
8. REFER TO ANY ORDER OF CONDITIONS ISSUED FOR
THIS PROJECT BY THE YARMOUTII CONSERVATION
COMMISSION FOR CONSTRUCTION SCHEDULE AND
ADDITIONAL GUIDELINES.
HYDROGRAGHIC PLAN OF LAND
IN
SOUTH YARMOUTH, MA
SHOWING
PROPOSED PIER, RAMP, AND PILE ANCHORED FLOATS
IN
BASS RIVER
• PREPARED FOR
DONALD GAUCH AND THEODORE ROGERS
DECEMBER 13, 1999 SCALE — AS NOTED
PREPARED BY .
ROBERT M. PERRY, P.E.
50 LELAND ROAD
BREWSTER, DLA 02631
508-896-4861
_II
L
t
r
Lcc c: s n,r 1 -
GENERAL NOTES
1. PLAN REFERENCE: PLAN BOOK 280, PG. 16; ASSESSORS'
MAP 92, PARCELS 7 & 8
2. ELEVATIONS REFER TO DLLR'. SEE BENCHMARK ON
TOP OF CORNER STONE AT STONE REVETMENT WEST
EAS'.
3. CONSTRUCTION ACCESS SHALL BE PRIMARILY BY THE
RIVER WITH LIMITED ACCESS DIRECTLY DOWN THE
PATH TO THE WORK SITE.
4. EXCAVATION SHALL BE LIMITED TO THAT NECESSARY
FOR PILING INSTALLATION. WHERE NAVIGABLE
WATER ALLOWS, PILINGS SHALL BE HAMMER DRIVEN.
MINIMUM PILING EMBEDMENT DEPTH SHALL BE 12 FT.
5. ALL HARDWARE USED FOR CONSTRUCTION SHALL BE
OF HOT DIP GALVANIZED STEEL OR EQUAL.
6. ALL TIMBER USED SHALL BE CONSTRUCTION GRADE,
YELLOW PINE, PRESSURE - TREATED FOR MARINE USE.
THE TREATED LUMBER SHALL BE INA "DRY -
PRESERVATIVE" CONDITION WITH NO PRESERVATIVE
RESIDUE PRESENT.
7. CONSTRUCTION MATERIALS AND DEBRIS SHALL NOT
BE STORED OR DISCARDED ON THE BANK OR BEACH.
THE BUFFER ZONE SHALL BE COMPLETELY CLEARED
OF ANY DEBRIS ON A DAILY BASIS.
8. REFER TO ANY ORDER OF CONDITIONS ISSUED FOR
THIS PROJECT BY THE YARMOUTII CONSERVATION
COMMISSION FOR CONSTRUCTION SCHEDULE AND
ADDITIONAL GUIDELINES.
HYDROGRAGHIC PLAN OF LAND
IN
SOUTH YARMOUTH, MA
SHOWING
PROPOSED PIER, RAMP, AND PILE ANCHORED FLOATS
IN
BASS RIVER
• PREPARED FOR
DONALD GAUCH AND THEODORE ROGERS
DECEMBER 13, 1999 SCALE — AS NOTED
PREPARED BY .
ROBERT M. PERRY, P.E.
50 LELAND ROAD
BREWSTER, DLA 02631
508-896-4861