Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH ` " SEWAGE PLAN REVIEW CHECKLIST Location: A.M. 2c Lot-2..- / Zone of Contribution: In Out Acreage C/ Commercial: Residential: _- Street: Ade 4,2../e'fri l z Village: � Y"frtL Floor Plan: t/ . #Bedrooms: Owner: , Gla U-a:eZb ee Installer: /ie. 4/' £t Address: Phone: ,52Y--. le-4•-• /G C---->o Phone: - bp.A-c= gl/$ Builder: Engineer: 5.S 4e/tar r e • f� Address: Phone: �'�--,,� - .' - Phone: , 4 - / j. Ag"""i''' G /A YES NO _ 1.Required#of copies received 2. Date of soils exam and percolation test not older than 2 years L____1 3. 4-5 ft of naturally occurring pervious material,above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: .....---- 5.Water line 10 ft from septic components Var.: ✓ 6.Benchmark indicated and shown-NGVD if near wetlands 1...----" 7. Septic tank minimum 10 ft from foundation, deck Var.: L----- 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: t._---• 9.Leaching minimum 100 ft from wetlands Var.: �---- 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: �/) k- 12. System meets all other setback requirements Var.: (.....----- 13.Uses adjustment for maximum high groundwater Var.: 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: / dr t_.-- 15. 15. System not in top or subsoil(A,B horizons)or 5' removal 16.Proposed contours are suitable �� 17. System meets slope requirements-min. 1/8", 'A"preferred `.--- 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee (..----- 20. Sewage is under 10,000 gpd for parcel � ---• - 21.No garbage disposal 1/4-___- 22. System adequately sized for its intended use `� 23.Minimum 6"stone or compacted below tank and dbox �_� 24.Manhole covers within 6"of grade,pump chamber cover to grade 1/4---- 25.Inspection port on plastic chambers/leach field 1/4._.-- 26. ._..26. Electrical permit for pump chamber/Separate meter for duplexes 1/4.___ 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size 1/4.....---- 28. Septic tank/pump chamber to be factory waterproofed 1/4...........- 29. s29.Vent provided if leaching below 3 feet,under driveway/parking 1/4....--- 30. -30.Buoyancy calculations for tank/pump chamber 1/4.___--• 31.Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 1/4.._.� 33.H-20 loading is subject to vehicular traffic, groundwater 34.Title V Application and permit fee, installer signature - ®.� 35.Foundation footing min. 2 feet above adjusted ground water for new house „®J- _ 36.Deed Restriction required max. #bedrooms: max. flow: gpd - ' 37. Check area lots for groundwater/Label groundwater in Assessor's Map '-- Plan reviewed by: ( 6/03/03