Loading...
HomeMy WebLinkAboutReview Checklist //r( TOWN OF YARMOUTH _ �� ' SEWAGE PLAN REVIEW CHECKLIST �- /15-57 Location: A.M. 77 Lot yS Zone of Contribution: Iny Out_ Acreage Q /f9-64-�'J `/�`� At) Commercial: Residential: (� Street:( ' Village: _ Floor Plan: #Bedrooms:-- Owner: 4.7, (;)? ......w Installer: Address: Phone: Phone: '2 4 -- 4_,:via .* � Builder: Engineer: � Address: Phone: lam}( . - t G -5 // Phone: &i .• 7 �, '&-e-4 N/A YES NO 1.Required# of copies received �.---- 2. Date of soils exam and percolation test not older than 2 years t....------ 3. 4-5 /3. 4-5 ft of naturally occurring pervious material, above water table _ 4.Foundation 2 ft above highpoint of road H.P.: Fnd: Var.: C�---- 5. Water line 10 ft from septic components Var.: (,,,.--, 6. Benchmark indicated and shown-NGVD if near wetlands t/• 7. Septic tank minimum 10 ft from foundation, deck Var.: / t��- 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: S ) (------ 9. (----_ 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: - 11. Tank/leaching minimum 10 ft from property line Var.: C....-- 12. �12. System meets all other setback requirements Var.: k_.--' 13. Uses adjustment for maximum high groundwater Var.: - 14. Leaching set 4-5 ft above adj.water or bottom of test hole Var.: L..---- 15. System not in top or subsoil(A,B horizons) or 5' removal Z----' 16.Proposed contours are suitable .....-..---• 17. System meets slope requirements-min. 1/8", 1A"preferred (._o. 18. System meets breakout requirements PVC liner: Wall: L,..--. 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel . 21.No garbage disposal `.--' 22. System adequately sized for its intended use ��. 23.Minimum 6" stone or compacted below tank and dbox Lr 24.Manhole covers within 6"of grade,pump chamber cover to grade < - 25. Inspection port on plastic chambers/leach field L.----"" 26. Electrical permit for pump chamber/Separate meter for duplexes ......---- 27.Pump system-2" line,weep hole,check valve,tee in dbox, pump size l.-----" 28. Septic tank/pump chamber to be factory waterproofed L� 29. Vent provided if leaching below 3 feet, under driveway/parking `._...---, 30. Buoyancy calculations for tank/pump chamber ...s 31. Engineer to inspect and certify soils: wall: commercial: ` 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature `---- 33.H-20 loading is subject to vehicular traffic, groundwater L...---. 34.Title V Application and permit fee, installer signature - C.:2) 35.Foundation footing min. 2 feet above adjusted ground water for new house �- 36.Deed Restriction required max. #bedrooms: _max. flow: _)-(J gpd _ 37. Check area lots for groundwater/Label groundwater in Assessor's Map �------"" Plan reviewed by: 6/03/03