Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH 4 � SEWAGE PLAN REVIEW CHECKLIST . 2I t�x.4:: Location: A.M. 42Lot /b 2 Zone of Contribution: Inut Acreage a�7/ Street: ( ��L��G�/(.� ` Commercial: Residential: �� Village: g-7- Y, Floor Plan: �� #Bedrooms: 2-- Owner: �� Installer: 7 Address: Phone: Phone: l ,/ . (50 - k Builder: Engineer: 2 ?-°'l G "ti/ 7 Address: Phone: 4ç ,,, W -- r Phone: .r-/)t /lilJ f/ N/A S )NO 1.Required# of copies received 2. Date of soils exam and percolation test not older than 2 years L.---- 3. i3. 4-5 ft of naturally occurring pervious material, above water table l.._-' 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: L...----- 5. Water line 10 ft from septic components Var.: l�---- 6.Benchmark indicated and shown-NGVD if near wetlands L--- 7. Septic tank minimum 10 ft from foundation, deck Var.: _ 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9 /.-- C:" e..-- 9.Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: t/ 12. System meets all other setback requirements Var.: _ L....---- 13. _�13.Uses adjustment for maximum high groundwater Var.: (..--- 14. e14.Leaching set 4-5 ft above adj.water or botto test-hb Var.: 1.�-+► , 15. System not in top or subsoil(A,B horizons) r 5' remo L----' 16.Proposed contours are suitable t ----- 17. 17. System meets slope requirements-min. 1/8", 1/4"preferredAA�� t...."'''18. System meets breakout requirements PVC liner:TO, . Tall: L...--- 19. Specified tee sizes are proper, gas baffle on outlet tee Lem 20. Sewage is under 10,000 gpd for parcel 1.------- 21. -O21.No garbage disposal C...----"'" 22. System adequately sized for its intended use L/ .23. Minimum 6"stone or compacted below tank and dbox 4.....---- 24. o24.Manhole covers within 6" of grade,pump chamber cover to grade L 25. Inspection port on plastic chambers/leach field , ,..---"' 26. Electrical permit for pump chamber/Separate meter for duplexes ✓' 27.Pump system-2" line,weep hole,check valve,tee in dbox, pump size ..-®-' 28. Septic tank/pump chamber to be factory waterproofed 1/4------ 29.Vent provided if leaching below 3 feet, under driveway/parking l �� 30. Buoyancy calculations for tank/pump chamber `,.-----, 31. Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature c,_,_,--• 33. H-20 loading is subject to vehicular traffic, groundwater L-----"� 34. Title V Application and permit fee, installer signature - 35.Foundation footing min. 2 feet above adjusted ground water for new house .....---- 36.Deed Restriction required max. #bedrooms: 2-max. flow: Z.->e gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map t.--------' Plan reviewed by: C--- 6/03/03