HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
" Location: A.M. `3j Lot C -7 Zone of Contribution: In Out Acreage
Commercial: Reside tial: L�
Street: �� W'
Village: Floor Plan: C Bedrooms:
Owner: v`S Installer: 8
Address: Phone:
Phone:
Builder: fia,(4i4Address: Phone: ' '7 74 -7/°‘
Phone: ' & Y 2 j
N/A YES NO
1.Required#of copies received to"'
2.Date of soils exam and percolation test not older than 2 years
3.4-5 ft of naturally occurring pervious material, above water table
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5. Water line 10 ft from septic components Var.:
6.Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.:
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9.Leaching minimum 100 ft from wetlands Var.:
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11.Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.: t_r
13.Uses adjustment for maximum high groundwater Var.:
14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.:
15. System not in top or subsoil(A,B horizons)or 5'removal L----
16.Proposed contours are suitable
17. System meets slope requirements-min. 1/8", 1/4"preferred
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel
- 21.No garbage disposal
22. System adequately sized for its intended use
23.Minimum 6"stone or compacted below tank and dbox �P
24.Manhole covers within 6"of grade,pump chamber cover to grade
25.Inspection port on plastic chambers/leach field tr
26.Electrical permit for pump chamber/Separate meter for duplexes �»
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size ._------
28. Septic tank/pump chamber to be factory waterproofed
29.Vent provided if leaching below 3 feet, under driveway/parking
30.Buoyancy calculations for tank/pump chamber ._.----
31.Engineer to inspect and certify soils: wall: commercial:
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature �--
33.H-20 loading is subject to vehicular traffic, groundwater
34.Title V Application and permit fee,installer signature
35.Foundation footing min. 2 feet above adjusted ground water for new house
36.Deed Restriction required max. #bedrooms: max.flow: gpd -®-'-
37.Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: 6/03/03