Loading...
HomeMy WebLinkAboutReview Checklist 2--- 7-/ 1 TOWN OF YARMOUTH . i SEWAGE PLAN REVIEW CHECKLIST Location: A.M. '( a Lot /Jri Zone of Contribution: In Out e .���/ / Commercial: Residential: Street: 74 � �""/ ,e /�� ? Village: - KO- Floor Pl G #Bedrooms: Owner: /4//1(X' ` -L Installer: ,-/9 , 4. ( Address: Phone: 6 -3 S Phone: t�,. /i X v• Builder: Engineer: Z21- J' • )6: , ?..5.0"e t Address: Phone: 67 2-" Phone: ,� / '6,---c.j) N/A S NO 1.Required#of copies received 2. Date of soils exam and percolation test not older than 2 years 3.4-5 ft of naturally occurring pervious material, above water table %..------ 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: �� 5. Water line 10 ft from septic components Var.: 6.Benchmark indicated and shown-NGVD if near wetlands L/ 7. Septic tank minimum 10 ft from foundation, deck Var.: 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: / " 9. Leaching minimum 100 ft from wetlands Var.: j 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: v / •11.Tank/leaching minimum 10 ft from property line Var.: � i 12. System meets all other setback requirements Var.: ✓---- 13.Uses adjustment for maximum high groundwater Var.: t& K-eZ'k`t CY/ '4". �� 14.Leaching set 4-5 ft above adj.water or bottom test hole Var.: r 15. System not in top or subsoil(A,B horizons) 5'remov . 16.Proposed contours are suitable al J l�/ ° 17. System meets slope requirements-min. 1/8", ' "preferred t/ 18. System meets breakout requirements PVC liner: irb.//,. .all: 19. Specified tee sizes are proper, gas baffle on outlet tee . 20. Sewage is under 10,000 gpd for parcel `--.- 21.No garbage disposal l ,..,--- 22. 22. System adequately sized for its intended use ✓' 23.Minimum 6"stone or compacted below tank and dbox �.--''-- 24.Manhole covers within 6"of grade, pump chamber cover to grade 25.Inspection port on plastic chambers/leach field -"' 26.Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size ‘..........--- 28. .-'28.Septic tank/pump chamber to be factory waterproofed •�--1 29.Vent provided if leaching below 3 feet,under driveway/parking `./ 30.Buoyancy calculations for tank/pump chamber ,`,. 31.Engineer to inspect and certify soils: wall: commercial: ......----- 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic, groundwater 34.Title V Application and permit fee, installer signature L� 35.Foundation footing min. 2 feet above adjusted ground water for new house ,.....------ 36. .--�36.Deed Restriction required max. #bedrooms: max. flow: gpd 37.Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: 6� 6/03/03 i