HomeMy WebLinkAboutVariance Approval Letter and Application - TOWN OF YARMOUTH
;/"'"'
( ' ` ��`—I SOUTH YARMOUTH MASSACHUSLI IS 02664
, „\MT
ATAGHEC`£ h:%T '.
' ').0 -z-- ,"( BOARD OF HEALTH
Ms. PAM GIRARD Variance frau Provisions of Title 5:
49 FINCH LANE Regulation:
WEST YARMOUTH, MA 0 2 6 7 3 Town Amendments: Section: 3.7
Re: LOT 1 - FINCH LANE Date: OCTOBER 4 , 1983
WEST YARMOUTH, MA As Shown On Engineered Plans By:
ELDREDGE ENGINEERS
Dear MS. GIRARD Dated:REVISED: 9/30/83
The Yarmouth Board of Health has received your application for a Variance frau
the provisions of Regulation of Title 5 of the State Environmental
Code and/or Section 3.7 of the Town of Yarmouth Amendments for Subsurface
Disposal of Sewage.
Having determined that strict enforcement of the above Regulations in this in-
stance would do manifest injustice, and further, that your requested variance
does not conflict with the spirit of the State Environmental Code or the Regu-
lations of the Town of Yarmouth Amendments, the variance is hereby granted on
this date OCTOBER 4, 1983 , as follows:
TO ALLOW FOUNDATION ELEVATION TO BE AT 0. 6 ' ABOVE HIGH POINT OF
ROAD AFFRONTING LOT INSTEAD OF REQUIRED 2 .0 ' ABOVE.
A VARIANCE OF 1.4 ' .
You must provide a 3/4 inch negative grade for fifteen feet surrounding the
foundation.
You are hereby advised that the variance granted herein will expire in 90 days
from date of issue unless all work authorized by said variance has been ca pleted
prior to the date of expiration.
In granting this variance the Town of Yarmouth will not be respons' • e for any
water damage to the foundation, septic system or adjoining lots.
'LI
if
I have read and fully understand the �/�/__
y'
conditions of the above variance and Truce i ;777' , . th Officer
accept then as written. Town of `1. '.'
�,uei R ,/`- cc: Building Department
Date: ja/�0 file
IUWN OF YAR 4XYIH
APPLICATION TOR VARIANCE
NAME:/ � <<P� DAZE: /G//
ADDRESS: d/-� kc ,4 e41G‘._
61.177(j-v)-/--e ?LA
Location of Variance r �i
Description of Variance ,t
7 _ 6 Se',1?4(/`-c
` 1
Sketch of Proposed Construction:
Work to be performed by:
Permit Number:
Inspected by:
Date: Signature, /
I '