HomeMy WebLinkAboutReview Checklist • 4-2-2TOWN OF YARMOUTH 6,--1/-0
SEWAGE PLAN REVIEW CHECKLIST J
Location: A.M. Z" -- Lot 3 3 7 Zone of Contribution: In Out -- - reage
Commercial: Residential:
Street: -27 Z� " .,/e .Village: j , QG`Leil if Floor Plan: �---' #Bedrooms: Z
Owner: C `�Gl G'�2' Installer: / i f� ,'ii, / t�/ph,,,l
.
Address: Phone: 4f. _ 1Il'
Phone: -
Builder: Engineer: ele ---Pie:;
Address: Phone: . .'se- ik¢-
a- i
Phone:
/61 Al 74‘' /.1 e'P /(C. AW .r 1 40444e4
N/A YES NO
1.Required# of copies received _ ✓
2. Date of soils exam and percolation test not older than 2 years t,. ------.
3. 4-5 ft of naturally occurring pervious material, above water table
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: `...--•"----'
5. Water line 10 ft from septic components Var.: t..---
6.Benchmark indicated and shown-NGVD if near wetlands .4.----
7. Septic tank minimum 10 ft from foundation, deck Var.: c.------
8.
.!8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: k------
9. Leaching minimum 100 ft from wetlands Var.: 1/4-------
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: c._...---
11. Tank/leaching minimum 10 ft from property line Var.: �®.
12. System meets all other setback requirements Var.:
13. Uses adjustment for maximum high groundwater Var.: aV, t�-
14. Leaching set 4-5 ft above adj. water or bottom of - Var.: (......----
15. System not in top or subsoil(A,B horizons or 5' re II• : 4,--------
16.Proposed contours are suitable L
17. System meets slope requirements-min. 1/8", '/4"preferred L.-
18. System meets breakout requirements PVC liner: Wall: t---
419.
- -- `.e19. Specified tee sizes are proper, gas baffle on outlet tee c._._-
-20. Sewage is under 10,000 gpd for parcel �.-•
21.No garbage disposal --_
22. System adequately sized for its intended use ` .
23.Minimum 6" stone or compacted below tank and dbox c
24.Manhole covers within 6"of grade,pump chamber cover to grade l
25. Inspection port on plastic chambers/leach field �-
26. Electrical permit for pump chamber/Separate meter for duplexes ,
27.Pump system-2" line,weep hole,check valve,tee in dbox, pump size
28. Septic tank/pump chamber to be factory waterproofed r---•
29. Vent provided if leaching below 3 feet, under driveway/parking 4-..-
30.Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial: (------
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature t./
33.11-20 loading is subject to vehicular traffic, groundwater ..---- •
34. Title V Application and permit fee, installer signature - �.�-"
35.Foundation footing min. 2 feet above adjusted ground water for new house �-..---'
36. Deed Restriction required max. #bedrooms: max. flow: gpd
37. Check area lots for groundwater/Label groundwater in Assessor's Map --~
Plan reviewed by: @ 6/03/03