Loading...
HomeMy WebLinkAboutReview Checklist -tet-- 7- 7' iLr� ..4 .. i TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST 01/ . '3 +Location: A.M. 67 Lce/ Zone of Contribution: In -Out Acreage Commercial: Residential:�- Street: 2) 9 / Village: 5 Q/1-g4fA (j-f Floor Plan: v #Bedrooms: 3 Owner: Installer: (///171. 63K--et. r Address: Phone: Phone: Builder: Engineer: 169-",1,04-Address: Phare: Phone: >7-1 \1 Zel- aile7 N/A YES NO 1.Required#of copies received 2.Date of soils exam and percolation test not older than 2 years 1.--- 3.4-5 ft of naturally occurring pervious material, above water table 5.- 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: �- 5.Water line 10 ft from septic components Var.: .......---- 6. 6.Benchmark indicated and shown-NGVD if near wetlands L.----* 7. Septic tank minimum 10 ft from foundation, deck Var.: 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: l 9.Leaching minimum 100 ft from wetlands Var.: `..-- 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ...--- 11.Tank/leaching minimum 10 ft from property line Var.: C 1 12. System meets all other setback requirements Var.: , _.-- 13. 13.Uses adjustment for maximum high groundwater Var.: �.---. 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: ,......---- 15. System not in top or subsoil(A,B horizons)or 5' removal 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 1/4"preferred L----• 18. System meets breakout requirements PVC liner: Wall: 1/4....----- 19. Specified tee sizes are proper, gas baffle on outlet tee v- 20. Sewage is under 10,000 gpd for parcel `_.\---- 21.No garbage disposal 22. System adequately sized for its intended use �®. 23.Minimum 6"stone or compacted below tank and dbox k.---- 24.Manhole covers within 6"of grade,pump chamber cover to grade L_� 25.Inspection port on plastic chambers/leach field �_.--, 26.Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size -' 28. Septic tank/pump chamber to be factory waterproofed _..-----4 29.Vent provided if leaching below 3 feet, under driveway/parking 30.Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: wall: commercial: --------. 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic, groundwater `.------� ` 34.Title V Application and permit fee, installer signature - CD) 35.Foundation footing min. 2 feet above adjusted ground water for new house ,ice 36.Deed Restriction required max. #bedrooms: max. flow: gpd _ 37.Check area lots for groundwater/Label groundwater in Assessor's Ma Plan reviewed by: 6/o3io3