HomeMy WebLinkAboutEngineered Plans - 2019�P�SH Or 4142
o��oa� AcyGJrn
" JOHN L.
CHURCHILL JR.
T N 48066
L
96.51
OF MgSsgc�G
o PETER T.
McENTEE
o CIVIL
No. 35109
Permit valid
for REPAIR OF SLI SYS"fGIN>
s-98---
ONLY, due 'lo State and Local septic variant
x 98,98
Board of Health
review and al)p►oval is e► for
—W
any 'uture
additions/ren;;v ;►ct�4�r�Fruns to
EXISTING GAS SVC.
S ' age face ' '
d uctul es/dwelling,
TEST PIT
X
BENCHMARK
96.46 Yar
opth f ie th Deparrrtmentl OT
C��
i
F9 �: lit 10,019
±SF
Z
X
--
y}98.67
/ X
I
' 98.58 X
II
HOUSE(j31)
:O.F.=100.61
F EL. =101.6]
1 � DECK
x�9 9
98.80 ;O-
1 x 99,13 i
l
,4 P
S
� 98,38 ..
PROPOSEDt
PUMP CHAMBER VENT
EXISTING LEACH FIELD 98,4
TO BE REMOVED \
(SEE NOTE 11) q�
INSTALL A 40 MIL POLY LINER
TOP OF LINER, EL.=99.2
BOTTOM OF LINER, EL.=96.3
STRIPOUT BOUNDARY
SEE NOTE 11 & VARIANCE
REQUEST #3
-I. 9 ,
VARIANCE REQUESTS
—310 CMR 15.405(1)(a)(g)&(h): CONTENTS OF LOCAL UPGRADE APPROVAL
1) A 3' variance, S.A.S. to property line(side), for a 7' setback.
2) A 3' variance, S.A.S. to property line(front), for a 7' setback.
—310 CMR 15.255(5): CONSTRUCTION IN FILL
3) Request a 3' reduction to the required 5' stripout boundary, for a
2' stripout around the perimeter of the SAS. Leaching calculations
for the proposed SAS are based on bottom area only.
99.18
+ ,
.40
8 1
9
❑
rI
X 9
r
QL
I
0
N
CL
BENCHMARK
RIGHT OUTSIDE CORNER
OF BOTTOM STEP
EL. =,e3a,;Z*— /t0} '�O
— EXIST. SEPTIC TANK
(TO REMAIN)
TOP, EL. =98.87
g INV. (OUT), EL.97. 48f
� I
RECEIVED
APR 2 6 2019
HEALTH DEPT.
LOCUS MAP
NOT TO SCALE
GENERAL NOTES:
1. ALL CHANGES TO THIS PLAN MUST BE APPROVED BY THE LOCAL BOARD OF
HEALTH AND THE DESIGN ENGINEER.
2. ALL WORK AND MATERIALS SHALL CONFORM TO THE REQUIREMENTS OF THE
STATE ENVIRONMENTAL CODE, TITLE V, AND ANY APPLICABLE LOCAL RULES
AND REGULATIONS, EXCEPT AS REQUESTED BY VARIANCE.
3. THE SEWAGE DISPOSAL SYSTEM SHALL NOT BE BACKFILLED PRIOR TO
INSPECTION AND APPROVAL BY THE BOARD OF HEALTH & DESIGN ENGINEER.
4. ANY CONDITIONS ENCOUNTERED DURING CONSTRUCTION DIFFERING FROM
THOSE SHOWN HEREON SHALL BE REPORTED TO THE DESIGN ENGINEER
BEFORE CONSTRUCTION CONTINUES.
5. ALL ELEVATIONS BASED ON AN ASSUMED DATUM, BARNSTABLE G.I.S.f.
6. THE DESIGN ENGINEER IS NOT RESPONSIBLE FOR THE FAILURE OF THE
CONTRACTOR OR OWNER TO NOTIFY THE LOCAL BOARD OF HEALTH FOR
PROPER INSPECTIONS DURING CONSTRUCTION.
7. WATER SUPPLY PROVIDED BY TOWN WATER SERVICE.
8. THERE ARE NO PRIVATE ABUTTING WELLS WITHIN 100' OF THE PROPOSED S.A.S.
9. ALL AREAS CLEARED FOR CONSTRUCTION SHALL BE RESTORED AS SHOWN ON
THE PLAN OR AS OTHERWISE DIRECTED BY THE APPROVING AUTHORITIES.
10. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY LOCATIONS
OF ALL UNDERGROUND UTILITIES, PRIOR TO BEGINNING CONSTRUCTION.
11. WHERE REQUIRED, CONTRACTOR SHALL REMOVE ALL UNSUITABLE SOILS BENEATH
AND FOR 2' ON ALL SIDES OF THE THE S.A.S. AND REPLACE WITH CLEAN SAND
AS SPECIFIED IN 310 CMR 255(3).
12. AREAS REQUIRING STRIPOUT OF UNSUITABLE MATERIALS SHALL BE INSPECTED BY
A LICENSED SOIL EVALUATOR PRIOR TO BACKFILL.
13. THE ENGINEER IS NOT RESPONSIBLE FOR ANY UNDOCUMENTED EXISTING SEPTIC
SYSTEM COMPONENTS NOT SHOWN ON THE PLAN.
14, CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO MAINTAIN THE
STABILITY OF ADJACENT STRUCTURES.
15. THIS PLAN IS TO BE USED FOR SEPTIC SYSTEM PURPOSES ONLY AND
IS NOT TO BE CONSIDERED A PROPERTY LINE SURVEY.
PLAN REVISION 4/25/19
1) ADD VENT PIPE & POLY LINER
PARCEL ID: 48-22
PROPOSED SEPTIC SYSTEM UPGRADE PLAN
31 CIRCUIT ROAD NORTH, WEST YARMOUTH, MA
Prepared for: D. A. Brown, Inc., P.O. Box 145, Centerville, MA 02632
Engineering by: Survey by: SCALE DRAWN JOB. NO.
Engineering Works, Inc. JC Engineering, Inc. 1 "=20' P.T.M. 141-19
12 West Crossfield Road 2854 Cranberry Hwy.
Forestdale, MA 02644 E.Wareham, MA 02538 DATE CHECKED SHEET NO.
(508) 477-5313 (508) 273-0377 4/13/19 P.T.M. 1 Of 3
LEGEND
s-98---
EXISTING CONTOUR
x 98,98
EXISTING SPOT GRADE
99 PROPOSED CONTOUR
—W
EXISTING WATER SVC.
—G
EXISTING GAS SVC.
—O.H. W.—OVERHEAD WIRES
TEST PIT
BENCHMARK
RECEIVED
APR 2 6 2019
HEALTH DEPT.
LOCUS MAP
NOT TO SCALE
GENERAL NOTES:
1. ALL CHANGES TO THIS PLAN MUST BE APPROVED BY THE LOCAL BOARD OF
HEALTH AND THE DESIGN ENGINEER.
2. ALL WORK AND MATERIALS SHALL CONFORM TO THE REQUIREMENTS OF THE
STATE ENVIRONMENTAL CODE, TITLE V, AND ANY APPLICABLE LOCAL RULES
AND REGULATIONS, EXCEPT AS REQUESTED BY VARIANCE.
3. THE SEWAGE DISPOSAL SYSTEM SHALL NOT BE BACKFILLED PRIOR TO
INSPECTION AND APPROVAL BY THE BOARD OF HEALTH & DESIGN ENGINEER.
4. ANY CONDITIONS ENCOUNTERED DURING CONSTRUCTION DIFFERING FROM
THOSE SHOWN HEREON SHALL BE REPORTED TO THE DESIGN ENGINEER
BEFORE CONSTRUCTION CONTINUES.
5. ALL ELEVATIONS BASED ON AN ASSUMED DATUM, BARNSTABLE G.I.S.f.
6. THE DESIGN ENGINEER IS NOT RESPONSIBLE FOR THE FAILURE OF THE
CONTRACTOR OR OWNER TO NOTIFY THE LOCAL BOARD OF HEALTH FOR
PROPER INSPECTIONS DURING CONSTRUCTION.
7. WATER SUPPLY PROVIDED BY TOWN WATER SERVICE.
8. THERE ARE NO PRIVATE ABUTTING WELLS WITHIN 100' OF THE PROPOSED S.A.S.
9. ALL AREAS CLEARED FOR CONSTRUCTION SHALL BE RESTORED AS SHOWN ON
THE PLAN OR AS OTHERWISE DIRECTED BY THE APPROVING AUTHORITIES.
10. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY LOCATIONS
OF ALL UNDERGROUND UTILITIES, PRIOR TO BEGINNING CONSTRUCTION.
11. WHERE REQUIRED, CONTRACTOR SHALL REMOVE ALL UNSUITABLE SOILS BENEATH
AND FOR 2' ON ALL SIDES OF THE THE S.A.S. AND REPLACE WITH CLEAN SAND
AS SPECIFIED IN 310 CMR 255(3).
12. AREAS REQUIRING STRIPOUT OF UNSUITABLE MATERIALS SHALL BE INSPECTED BY
A LICENSED SOIL EVALUATOR PRIOR TO BACKFILL.
13. THE ENGINEER IS NOT RESPONSIBLE FOR ANY UNDOCUMENTED EXISTING SEPTIC
SYSTEM COMPONENTS NOT SHOWN ON THE PLAN.
14, CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO MAINTAIN THE
STABILITY OF ADJACENT STRUCTURES.
15. THIS PLAN IS TO BE USED FOR SEPTIC SYSTEM PURPOSES ONLY AND
IS NOT TO BE CONSIDERED A PROPERTY LINE SURVEY.
PLAN REVISION 4/25/19
1) ADD VENT PIPE & POLY LINER
PARCEL ID: 48-22
PROPOSED SEPTIC SYSTEM UPGRADE PLAN
31 CIRCUIT ROAD NORTH, WEST YARMOUTH, MA
Prepared for: D. A. Brown, Inc., P.O. Box 145, Centerville, MA 02632
Engineering by: Survey by: SCALE DRAWN JOB. NO.
Engineering Works, Inc. JC Engineering, Inc. 1 "=20' P.T.M. 141-19
12 West Crossfield Road 2854 Cranberry Hwy.
Forestdale, MA 02644 E.Wareham, MA 02538 DATE CHECKED SHEET NO.
(508) 477-5313 (508) 273-0377 4/13/19 P.T.M. 1 Of 3
EXISTING SEPTIC TANK &
NOTE: TO PREVENT BREAKOUT, CONTRACTOR
PROPOSED PUMP CHAMBER
SHALL INSTALL A 40 MIL POLY LINER
PROVIDE RISERS & COVERS AS DESCRIBED:
PROPOSED D-SO
TOP OF LINER, EL.=99.2
BOTTOM OF LINER, EL.=96.3
1) INLET COVER SET TO 6" OF GRADE.
INSTALL WATERTIGHT RISER, FRAME
2) 20" OUTLET COVER SET TO GRADE
& COVER SET TO 6" OF GRADE
MANHOLE COVER SHALL BE SECURED
TO PREVENT UNAUTHORIZED ACCESS.
(H-20 RATED)
PROPOSED S.A.S.
INSTALL ONE INSPECTION PORT (MIN.)
F.G. EL.=99.5±
F.G. EL.=99.2(EXISTING) PROVIDE ENOUGH WIRE F.G. EL: 99.8±
F.G. EL.=99.81 VENT PIPE
DECK
EXISTING'
HOUSE 31
SLACK TO REMOVE
PUMP
MAINTAIN 2% GRADE (MIN.) OVER S.A.S.
/
T. 0. F. =100.6±1
L - 17'(MAX
4" FOR INSPECTION PORT,
.S., SOLID
18' x 25' LEACHING FIELD W/3-4" PERFORATED IN S.AVE
/ ,FF EL.=101.6±'
/
j
CKS 4'SCHao� (MIN.) SCH
S.A.S WITH
40 PERF. PVC DISTRIBUTION LINES SETT TO WITHIN 'A' OFOGRADE.EW AP
/
® S=1i (MIN.) TOP EL.=98.50
4'SCH40 PVC
?1DECNR 0ENDS
PRO Ai NO-
MANIFOLD ALL LINES
,
g^
6" EFF.DEPTH
TO VENT PIPE
14, o"
NV.=98.97 INV.=98.80
SLOPE OF PERF. PIPE = 0.5% INV. EL.=98.50 END
S,
�yz
PROPOSED D-BO
25' EFFECTIVE LENGTH
O �� pr$• .y�1,'
ADD
fNV.=97.25
EFFLUENT 2 FLOATS
3 OUTLETS (MIN.)
SOIL ABSORPTION SYSTEM (PROFILE)
(
FILTER USE OUTLET
INV.=97.00± INV.=98.63
KNOCK OUT
EXISTING IOTT. EL.=92.50
MAX. G.W. EL. 93.9
STANDING
'S
I `0 nor' h�
SEPTIC TANK 1000 GALLON PUMP CHAMBER
G.W. EL. 93.2
WITHIN DRIVEWAYu7
I�
INV.=97.48± H-20 RATED
( )
2" OF 3/8" NATIVE CRUSHED STONE
�
EXISTING ACME-SHOREY PRECAST (ST102M)
(FIELD VERIFY)
10"() MIN. OF COMPACTED BANK RUN GRAVEL
U) O
D -O
(See Pump Detail, Sheet 3)
FINISH GRADE
0
NOTES:
EL.=99.8 to 99.91
Cn
' rrl
1) PUMP CHAMBER & D -BOX SHALL BE SET LEVEL AND TRUE_
TO GRADE ON A MECHANICALLY COMPACTED 6" CRUSHED
APPROVED
Y" FILTER FABRIC
BREAKOUT ELEV.=98.98 "" '''' ' `' '` '.r: ''~?:''" :'" "r:..,:" !"
STONE BASE, AS SPECIFIED IN 310 CMR 15.221(2).
80
1°---I �-
8
2) INSTALL INLET & OUTLET TEES AS REQUIRED.
BOTTOM ELEV.=98.00
SHED
3) MAX. COVER OVER SEPTIC TANK, D -BOX & S.A.S. SHALL BE 36"'
3'
6' 6' 3'
4 CONTRACTOR SHALL VERIFY ALL EXISTING PIPE INVERTS PRIOR
)
4' MIN. SEPARATION TO G.W.
AND 4' OF NATURALLY
18' EFFECTIVE WIDTH
TO CONSTRUCTION.
OCCURRING PERVIOUS SOILS
3/4"-1 1/2" DOUBLE
5) EFFLUENT FILTER SHALL BE INSTALLED ON OUTLET
TEE AS MANUFACTURED BY ZABEL OR EQUAL. FILTER
SOIL
EST. HIGH G.W. EL: 93.9 _
ABSORPTION SYSTEM (SECTION) WASHED STONE
S.A.S. LAYOUT
SHALL BE INSPECTED AND CLEANED ANNUALLY.
SEPTIC SYSTEM PROFILE
DOSING & STORAGE REQUIREMENTS
DESIGN CRITERIA
SOIL LOG
DESIGN FLOW: 330 GPD
DATE: APRIL 4, 2019
DOSING REQUIRED: 4 CYCLES/DAY (SAND)
NUMBER OF BEDROOMS: 2
SOIL
EVALUATOR: PETER McENTEE (SE#1542)
330 - 4 = 82.5 GALLONS/CYCLE
SOIL TEXTURAL CLASS: CLASS I
WITNESS: AMY VON HONE RS -HEALTH AGENT
DISTANCE REQUIRED BETWEEN PUMP
DESIGN PERCOLATION RATE: 3 MIN/IN
Elev. TP Depth
ON AND PUMP OFF FLOATS:
99.5 0
82.5 GAL/CYCLE - 250 GAL/FT = 0.33 FT/CYCLE (SAY 4")
DAILY FLOW: 220 GPD
FILL
DESIGN FLOW: 330 GPD
98'0 A 18
STORAGE REQUIRED ABOVE WORKING LEVEL: 330 GALLONS
GARBAGE GRINDER: NO
LOAMY SAND
STORAGE PROVIDED:
10YR 3/3
LEACHING AREA REQUIRED: (330 GPD) = 445.9 SF
97.7 B 22"
INV.(IN) EL: 97.25 - PUMP ON EL: 94.00 = 3.25'
.74 GPD/SF
LOAMY SAND
STORAGE PROVIDED = 3.25' x 250 GAL/FT = 812.5 GALLONS
10YR 5/8
EXISTING SEPTIC TANK: 1000 GALLON CAPACITY
97.0C 30"
PROPOSED PUMP CHAMBER: 1000 GALLON CAPACITY, H-10
FERC
PROPOSED D -BOX: 1 INLET, 3 OUTLET (MIN.), H-10
MED. SAND 17"/35"
PROPOSED SEPTIC SYSTEM UPGRADE PLAN
INSTALL AN 18' x 25' LEACH FIELD
2.5Y 6/6
31 CIRCUIT ROAD NORTH, WEST YARMOUTH, MA
93.9 AD G.W
. .
Prepared for: D. A. Brown, Inc., P.O. Box 145, Centerville, MA 02632
SIDEWALL AREA: NOT APPLICABLE
BOTTOM AREA: 18' x 25' = 450 S.F.
93.2 STG. G.W. 76"
91.5 96"
Engineering by:
Survey by:
SCALE
DRAWN
JOB. N0.
TOTAL AREA: ..................................... 450 S.F.
STANDING G.W. @ 76" (EL.=93.2)
Engineering Works, Inc.
JC Engineering, Inc.
N.T.S.
P.T.M.
141-19
INDEX WELL,
MIW-29,WATER LEVEL=6.8 (MARCH 2019)
12 West Crossfield Road
2854 Cranberry Hwy.
SHEET NO.
DATE
CHECKED
LEACHING CAPACITY = 0.74 GPD/SF x 450 SF = 333
GPD
ZONE A, ADJUSTMENT=0.7' (EL.=93.9)
Forestdole, MA 02644
E,Wareham, MA 02538
PERC RATE 3 MIN/IN. ("B/C' HORIZON)
1 (508) 477-5313
(508) 273-0377
4/13/19
P.T.M.
2 Of 3
NEMA 4 JUNCTION BOX CORROSION RESISTANT
& LIQUID—TIGHT CABLE CONNECTORS SUPPORTED
BY 1-1/4" PVC CONDUIT. JOINTS TO BE MADE
PROVIDE WATERTIGHT CONCRETE RISER WITH WATERTIGHT. USE SJE RHOMBUS—JB PLUGGER
SECURED FRAME &COVER TO GRADE
OR EQUAL. PROVIDE ENOUGH WIRE
2" BALL VALVE (FIELD ADJUST FOR 20 GPM RATE)
SLACK TO REMOVE PUMP
BH
[]
(INSTALL QUICK DISCONNECT FOR EASY REMOVAL)
INSTALL 1' PVC CONDUIT TO HOUSE FOR WIRING
HOISTING CABLE 7x19 STAINLESS STEEL
WITH WATERTIGHT JOINTS. WIRE HIGH' WATER ALARM
LNDY.
1/8" DIAMETER. / 1,760 LB. STRENGTH
FLOAT TO SJE RHOMBUS TANK ALERT XT ALARM PANEL
PROVIDE ENOUGH WIRE
ON CIRCUIT SEPARATE FROM CIRCUIT, TO THE PUMP.
SLACK TO REMOVE PUMP
BAT H
INV.(IN)=97.25
2"SCH. 40 DISCHARGE (THROUGH RISER—SEE PROFILE)
1/4" WEEP HOLE
BEDROOM
ALARM ON EL: 94.50
2„ 90' ELBOW
DECK
PUMP ON EL: 94.00
KIT./DIN.
PUMP OFF EL. 93,67 18"
2" SWING CHECK VALVE
BOTTOM OF 12
8"
2" SCH. 40 PVC DISCHARGE PIPE
PUMP CHAMBER
ELEV.= 92.50
ADDITIONAL 3/16" VENT HOLE (MIN.) ABOVE PUMP FLANGE
LIVING ROOM BEDROOM
PROVIDE 2— WIDE ANGLE FLOATS: 6
(TO PREVENT PREMATURE PUMP BURNOUT)
FLOAT NO.1: PUMP ON/OFF—SJ RHOMBUS (PROVIDED WITH
PUMP) LIBERTY LE40 SERIES PUMP .4 H.P. 115 V
FLOAT NO.2: ALARM ACTIVATION FLOAT—PROVIDED WITH ALARM PANEL WITH 2" DISCHARGE, OR EQUAL
(ON SEPARATE CIRCUIT FROM PUMP SPECIFIED)
PUMP AND ACCESSORIES AVAILABLE AT:
CAPE COD WINWATER WORKS CO., HYANNIS, MA. (508) 862-0166
NOTE: APPROVED ALTERNATE MAY BE SUBSTITUTED.
PUMP DETAIL
FLOOR PLAN
N.T.S.
A< -I
B I I B
NOTES:
/~ I
2, STEELETE MINIMUM EINFORCEMENT::RASTMHA615,OPSI GRADET60$ DAYS..
BUOYANCY CALCULATIONS
3. DESIGN LOADING STANDARD UNITS — AASHTO — H2O
4. A POLYMER WATERPROOF COATING SHALL BE APPLIED TO THE PRECAST UNIT.
I
5. PUMP CHAMBER SHOWN IS AS MANUFACTURED BY ACME —SHOREY PRECAST CO.,
1000 GALLON MONOLITHIC H-20 PUMP CHAMBER
L
PRODUCTS, 334 TREMONT STREET, CARVER, MA 02330
— — — — — 776.
SEAM SEALED WITH FLEXIBLE BUTYL RUBBER.
BOTTOM OF UNIT EL.= 92.50
(- 6'-8- 6"
HIGH GROUNDWATER EL.=93.90
BUOYANCY FORCE PER F OF DEPTH:
A�
SPECIFIED WEIGHT=16,500 LBS.
7.7' x 6.0' x 1' x 62.4 lbs. u.ft. = 2882.9 lbs. ft.
/c /
PLAN
MAX. DISPLACEMENT = 93.90 — 92.50 = 1.40'
MAX. UPLIFT PRESSURE = 1.40' X 2882.9 lbs/ft = 4035.1 Ibs.
WEIGHT OF UNIT EMPTY = 16,500 Ibs.
O
016,500
I
Ibs > 4036.1 Ibs O.K.
0 0 i
I , I
co
48" Liquid Level
to
SEE NOTES 4
I
PROPOSED SEPTIC SYSTEM UPGRADE PLAN
& 5 BELOW I
j - - - —
q--—
31 CIRCUIT ROAD NORTH, WEST YARMOUTH, MA
f-7'-8"-�
1I-- 6;—
Prepared for: D. A. Brown, Inc., P.O. Box 145, Centerville, MA 02632
SECTION B—B
SECTION A—A
Engineering by:
Survey by:
SCALE
DRAWN
JOB. NO.
1000 GALLON
H-20 MONOLITHIC PUMP CHAMBER
Engineering Works, Inc.
JC Engineering, Inc.
Hwy.
N.T.S.
P.T.M.
141-19
DATE
CHECKED
SHEET NO.
12 West Crossfield Road
Forestdale, MA 02644
2854 Cranberry
E.Woreham, MA 02538
(508) 477-5313
(508) 273-0377
4/13/19
P.T.M.
3 Of 3