Loading...
HomeMy WebLinkAboutReview Checklist 3 \ SEWAGE PLAN REVIEW CHECKLIST Location: `AM £s LOT Tl01 Date of Subdivision Approval a3-,x-$7 Street 3'y a ESET IR7-/{ Zone of Contribution: In X Out VillageWESTYAevOta-1t Commercial Residential X Owner&SEp* R. FAA)i oeE Installer OnAgreey6g5T L(Cp A) 1p, 33 G*' s,cD Rmo, WEvrYi ew,,a m Builder OWVEe Engineer Aw,9up LVELzxe, 7,4t, N/A Yes No 1 . Required number of copies received. 2. Date of soils exam and percolation test not older than 2 years. 3. 4 feet of naturally occcurring pervious material. 4. Foundation 2 feet above high point in fronting road. X 5. Water availability letter from Water Department. ))i 6. Benchmark indicated and shown. 7. Building sewer does not exit center of house. X 8. Septic tank a minimum of 10 feet from house and deck. )( 9. Leaching a minimum of 20 feet (10 feet) from house and deck. 10. Leaching a minimum of 100 feet from wetlands. 11 . Leaching a minimum of 150 feet from wells. 12. System meets all other setback requirements. X 13. USGS adjustment used for maximum high groundwater. )( 14. Leaching 4 feet above adjusted water table or bottom of test pit. x 15. System not in top or subsoil or 10 foot removal. X 16. Proposed contours are suitable. x' 17. System meets slope requirements. 18. System meets breakout requirement. X 19. Specified tee sizes are proper. X 20. Sewage flow not over 10000 gpd. 21 . No garbage disposal. x 22. System adequately sized for its intended use. x 23. Engineer to certify. a. Clay removal. )e b. 25 foot removal. X c. Tight installation. )C d. Commercial system. 24. Engineer and Land Surveyor Stamp and Signature. 25. H 20 Loading when system is subjected to vehicular traffic. )( 26. Title 5 application and fee signed by licensed installer )1( 27. Foundation footing 2 feet above adjusted water table. Plan reviewed by7 n 2/4/88 TH:fs